![Bearcat BC-502/CRC Instruction Manual Download Page 60](http://html1.mh-extra.com/html/bearcat/bc-502-crc/bc-502-crc_instruction-manual_2717123060.webp)
BC-502/CRC
60
c.
Move the
Left Wing
switch down. When the wing lowers to
approximately 10°. Above horizontal, the spray valves on the
wing section should indicate ON automatically on the display.
d.
Repeat the wing safety switch test for each wing section that can
be raised.
e.
Repeat with the
Right Wing
switch while watching the
movements of the right wing.
Flushing Tank
The tank can be loaded by any of the seven methods as described.
WARNING:
TO AVOID POTENTIAL SEVERE BURNS, SERIOUS INJURY
OR DEATH, PERSONNEL MUST READ SECTION 2 (SAFETY
PRECAUTIONS) BEFORE OPERATING BEARCAT
EQUIPMENT
WARNING:
EXTREME CARE MUST BE USED WHEN CHANGING AN
ASPHALT DISTRIBUTOR FROM WET ASPHALT TO HOT
ASPHALT. FAILURE TO FOLLOW THE PROCEDURES
COULD CREATE A POTENTIAL STEAM EXPLOSION
HAZARD, RESULTING IN SEVERE BURNS, INJURY OR
DEATH.
WARNING:
IF ANY MOISTURE IS PRESENT IN THE TANK OR IF THE
DISTRIBUTOR WAS PREVIOUSLY USED WITH
EMULSIFIED OR WATER BASED MATERIAL, DO NOT
LOAD WITH NEW MATERIAL AT ANY TEMPERATURE
ABOVE 200°F (93°C). BEFORE MACHINE CAN BE
LOADED WITH HOT MATERIAL, IT MUST BE FLUSHED
USING THE TANK FLUSHING PROCEDURE.
Anytime an asphalt distributor has been used with “emulsified asphalt” or
a “water based” product it should be considered “wet”. When changing
to hot asphalt (any material over 200°F (94°C) extreme caution must be
taken. Emulsified asphalt is approximately 40% water. Water boils at
212°F (100°C) and converts to steam. The water is heavier than asphalt, so
it is at the bottom when it converts to steam. This process can take only
seconds. When the water converts to steam, it displaces the asphalt with
enormous force. This will cause the tank to boil over or even erupt
splashing hot asphalt on everything within a 100 foot radius.
NOTE:
Hot is any material that is in excess of 200°F (94°C).
Summary of Contents for BC-502/CRC
Page 1: ...INSTRUCTION MANUAL Model BC 502 CRC Asphalt Distributor ...
Page 42: ...BC 502 CRC 42 ...
Page 43: ...43 ...
Page 69: ...69 ...
Page 87: ...87 Stage 1 ...
Page 151: ...151 Figure 13 INNER WING ASSEMBLY Figure 14 HYDRAULIC SYSTEM ...
Page 152: ...152 Figure 15 REAR PANEL ASSEMBLY ...
Page 154: ...154 Figure 17 PUMBING AND VALVE ASSEMBLY ...
Page 156: ...156 Figure 19 PUMP DRIVE ASSEMBLY ...
Page 157: ...157 Figure 20 PRODUCT PUMP ...
Page 158: ...158 Figure 21 SIDE CONTROL BOX SCHEMATIC ...
Page 159: ...159 Figure 22 CAB CONSOLE SCHEMATIC ...
Page 160: ...160 Figure 23 VALVE BOX SCHEMATIC ...
Page 161: ...161 Figure 24 REAR CONTROL BOX SCHEMATIC ...
Page 162: ...162 Figure 25 REAR CONTROL BOX PROPANE SCHEMATIC ...
Page 163: ...163 Figure 26 HYDRAULIC LAYOUT ...
Page 164: ...164 Figure 27 HYDRAULIC SCHEMATIC ...