
88 - Documenting Calibrator
Plant Structure Levels
The name of the current Plant Structure Level is shown on the status
bar. Tap on the bar to see the full Plant Structure path. Plant Structure
Sublevels have yellow background and the upper right corner is folded.
The Level's name is displayed and on the lower right corner, the amount of
further Sub the amount of instruments found on the next Sublevel.
Figure 77: Current Plant Structure Level is called "Pulp". A total of 22
instruments are located on this Level and all its Sublevels. Sublevel
"Evaporation" has two Sublevels and 18 instruments
To
select
a Plant Structure Level, tap on it. Then the contents of that level
are displayed. To
return
to the previous level, tap on the "Back" button
found on the right side of the Instrument List window.
Figure 78: "Back" button
Creating and managing
Plant Structure Levels
is presented in chapter
.
Note:
Deleting a branch level also deletes all instruments and
calibrations found on that level and all its sublevels. You cannot
delete the structure root level.
Work Order View Mode
Work Order View Mode is an optional way of viewing the instruments.
This option is of use, when instruments have been sent from Beamex
CMX Calibration Software together with Work Orders in their Calibration
Figure 79: Activating Work Order View Mode
on how to
activate Work Order View.
Summary of Contents for MC6-T
Page 2: ......
Page 38: ...38 General description ...
Page 66: ...66 Tools ...
Page 138: ...138 Communicator ...
Page 150: ...150 Service and transportation instructions ...
Page 168: ...168 Additional Information ...
Page 172: ...172 Index ...