Be Modern ABBEY GAS FIRE Installation And Servicing Instructions Download Page 1

 

- 1 - 

 

 

 

 
                 
 

 

Inset Live Fuel Effect  

MODEL 520 Slimline Inset 

 

For use on Natural Gas at a supply pressure of 20mbars in G.B./I.E 

 
 
 

 

INSTALLATION AND SERVICING 

INSTRUCTIONS 

 

(For user’s instructions, please see reverse) 

 

 
 
 
 

 

These instructions must be handed to the user 

to be kept in a safe place for future reference 

 

Part No. 200379   

Issue 4. 

GC No. 32-210-14 

 

Patent application No. 0123387.3 

 
 

 

 
 
 
 
 
 
 
 

Be Modern Customer Care, Bede Industrial Estate 

Jarrow, Tyne and Wear, NE32 3BE 

Tel: (0191) 489 8266 option 4. 

 

Summary of Contents for ABBEY GAS FIRE

Page 1: ...SERVICING INSTRUCTIONS For user s instructions please see reverse These instructions must be handed to the user to be kept in a safe place for future reference Part No 200379 Issue 4 GC No 32 210 14 P...

Page 2: ...nt and Ashpan Cover 4kg Safety Environment Recommendations If carrying distance exceeds 10m or stairs steps are involved then 2 person lifting should be considered Alternatively use sack barrow for lo...

Page 3: ...bar Injector 1 off No 77 Spark Gap 4mm 0 5mm Overall Dimension Width Height Depth 470mm 585mm 120mm General Installation Requirements Prior to installation ensure that the local distribution condition...

Page 4: ...the face of the opening and the flue terminal to allow dispersion of flue gases The fire must only be installed on non combustible walls with a flat area minimum 30mm required around the face of the...

Page 5: ...gram 1D Wooden combustible materials may be fitted to within 100mm on either side of the fire minimum 660 between uprights providing it does not project forward more than 100mm If the projection is gr...

Page 6: ...ireplace opening There are also four fixing holes in the fire front frame if required Check that the rear face of the opening is structurally sound and fit the eyelets and wallplugs in the position sh...

Page 7: ...e one piece front fibre into position on the front fibre support bracket on the burner assembly The two outer rear edges must touch the rear fibre bed at its extreme edges and should fit inside the up...

Page 8: ...tive film from the trim take the trim off the fire Remove the protective film Refit the trim to the fire with the magnets attached Three Piece Clip on Trim Remove the protective film on the trim The l...

Page 9: ...M5 screws and two M5 nuts to fix fret to fire as follows 1 Thread nut onto screws up to the screw head 2 Insert the two M5 screws into the back of the fret and screw in as far as they will go 3 Then o...

Page 10: ...point is positioned on the inlet elbow The inlet pressure can be verified and the soundness of all the gas joints tested up to the fire can now be checked The fire is set in the factory to operate at...

Page 11: ...is from the ceramic parts using a soft brush Replace all ceramic parts as detailed in these instructions Always test for gas soundness and carry out a spillage test after servicing this appliance Remo...

Page 12: ...coloured 4 1 Plain Black Fibre Board Set 101305 H06 497 5 1 Plain Cream Fibre Board Set 101317 H06 499 6 1 Gas Control Tap 101996 H50 950 7 1 Elbow Injector 21 size 77 100177 E75 148 8 1 Gas Control K...

Page 13: ...utes Ventilation This appliance does not normally require additional ventilation into the room For Republic of Ireland ventilation may be required Refer to local rules in force Replaceable Parts The c...

Page 14: ...pts you MUST wait for 3 minutes prior to attempting to re light Having confirmed that the burner is alight keep the control knob pressed in for further 10 seconds and then release The burner should no...

Reviews: