background image

SOLAR POWERED LIGHTED WINDSOCK FRAME

Model 740SPLWF, 740SPCU-1220 or 740SPCU-3555

NO SCALE

DATE

DATE

DRAWN

APPD

REV

1/8/06

 4/18/20

KLB

RBB

LIGHTED WINDSOCKS 
INSTALLATION (Mech/Elect)

www.LightedWindsocks.com

READ ALL INSTRUCTION BEFORE  ATTEMPTING  INSTALLATION

3 conductor cable

Two bolts and nuts
provided

Eight (8) foot 1" (ID) Sch 40
mounting pipe supplied
"By Others" for mounting

Two feet left for supporting
pole (approximately).

Solar powered

top beacon

See notes

The pipe extending
above the frame is for
the installation of a top
beacon when ordered

1.  The wiring to the Solar Panel and Control Unit is always installed in the windsock 
     frame support pipe. 
     The Model 740SPLWF-CTB lighted windsock frame is supplied with a solar
     powered top beacon and does not require any external power. This item is only
     supplied when ordered as a Model 740SPLWF-CTB. Consult factory for details.
2.  Install the mounting pile and Control Unit as shown.
3.  Connect the wires coming from the LED light assembly to the connection
     terminals marked "load". Black wire ground or negative (-), red wires positive (+).
     Note: If a third wire (white) is supplied coming from the Windsock this wire is 
     for changing the lights flash patterns. This wire is normally OPEN 
     and only momentarily connected to +12VDC power to change the flash pattern/s. 
     See attached data sheet for details. Consult factory.
4.  All wires must enter the bottom of the Control Unit through the supplied
     compression fitting. Tighten fitting after wiring is complete.
5.  Check all wiring is correct and secure before securing Control Units cover.
      

FRAME INSTALLATION GUIDE - TOP BEACON

Windsock in a limp position
(no wind) hangs down from
frame approximately...
C421IO (18"x5'x8") 33 inches
C422IO (18"x8'x 8") 66 inches 

Wires from windsock frame 
to Control Unit approximately 
12 feet

Changing Windsock Flash Patterns  - Multi patterns available
1. With LED's active connect white flash pattern wire to +12 volts for
    more than 1 second will cause the lighthead to cycle through the 
    flash patterns. When the desired pattern is displayed, allow it to
    run for more than 5 second. This pattern is selected.
   This feature is not available for all windsock LED lights or top beacons.

Customer may connect a 1" or
larger mounting pipe below
pipe supplied using the proper
coupling.

Control Unit

with

Sunlight Controller

and

Battery

Solar Panel

with

Mounting

Brackets

2 conductor cable

Two bolts and nuts
provided. Do not remove.

Eight (8) foot 1" (ID) Sch 40
mounting pipe supplied
"By Others" for mounting

Top Beacon

AC Powered

Windsock in a limp position
(no wind) hangs down from
frame approximately...
W185-IO (18"x5'x8") 45 inches
W188-IO (18"x8'x8") 80 inches 

Wires from windsock frame 
to Control Unit 12 feet 
(approximately).

Customer may connect a 1" or
larger mounting pipe below
pipe supplied using the proper
coupling.

3 conductor cable

SP Control Unit

with

Sunlight Controller

and

Battery Pack

Solar Panel

with

Mounting

Brackets

2 conductor cable

    939 NATHANIEL TRAIL    WARWICK, PA 18974

BDS

 

SYSTEMS INC.

    939 NATHANIEL TRAIL    WARWICK, PA 18974

BDS

 

SYSTEMS INC.

    939 NATHANIEL TRAIL    WARWICK, PA 18974

BDS

 

SYSTEMS INC.

    939 NATHANIEL TRAIL    WARWICK, PA 18974

BDS

 

SYSTEMS INC.

    939 NATHANIEL TRAIL    WARWICK, PA 18974

BDS

 

SYSTEMS INC.

    939 NATHANIEL TRAIL    WARWICK, PA 18974

BDS

 

SYSTEMS INC.

The pipe extending
above the frame is for
the installation of a top
beacon when ordered

Solar powered

top beacon

See notes

Summary of Contents for 740SPCU-1220

Page 1: ...t through the supplied compression fitting Tighten fitting after wiring is complete 5 Check all wiring is correct and secure before securing Control Units cover FRAME INSTALLATION GUIDE TOP BEACON Cha...

Page 2: ...l Unit as follows a First connect the battery to the proper terminals on the SL 10 Solar Controller Plus wire to terminal of battery negative wire to terminal of battery b Next connect the solar panel...

Page 3: ...ON for 3 Hrs Then OFF Then ON 1 Hr before Sunrise 4 2 DAY OFF Sunset ON for 4 Hrs Then OFF Then ON 2 Hrs before Sunrise 6 2 DAY OFF Sunset ON for 6 Hrs Then OFF Then ON 2 Hrs before Sunrise D D DAY O...

Page 4: ...ms OFF for 300ms in a repeated pattern d 15 is ON for 2 seconds OFF for 2 seconds 50 duty cycle in a repeated pattern 4 DoubleFlash 150fpm and 75fpm double flash burst a 150fpm followed by an OFF time...

Page 5: ...t shown in this drawing Support for the bottom support pipe is By Others 3 The BDS supplied 1 ID threaded connection has a 1 315 nominal outside diameter 4 Galvanized schedule 40 pipe available at any...

Page 6: ...n bottom bearing Delrin top bearing Delrin rain Cap Delrin bottom support bearing Notes 1 Windsock frame support rods and windsock mounting ring not shown 2 Miscellaneous screws bolts not labeled All...

Page 7: ...ssemble two clamps to arm assembly as shown Do not tighten 5 Position arm assembly over center of solar panel pushing bottom clamps all the way down into frame and loosely tighten bottom clamp 6 Next...

Page 8: ...code Steady Burn Flash code 001 Steady Burn Std Many other flash codes are available such as Flash code 079 2 seconds ON 2 seconds OFF Flash code 078 1 second ON 1 second OFF Flash codes can be field...

Page 9: ......

Page 10: ...ocks visit www LightedWindsocks com j All Items made in the USA k Inches X 2 540 cm Feet X 0 3048 mts l Cm X 0 3937 inches Meters X 3 281 feet Schedule 40 PVC sunlight resistant tubing with Delrin bea...

Page 11: ...rnished by others No warranty is applicable on any Xenon flash tubes light bulbs LED s or any other illuminating items Items made of nylon or other cloth materials have a warranty of 90 days from date...

Page 12: ...ld take some digital pictures of the installation and email them to us Please let us know the location details and purpose of the installation We would like to feature this on our website www LightedW...

Reviews: