background image

                                                                                     

BDCOM P3310B EPON Installation Manual   

 

 

Summary of Contents for P3310B

Page 1: ...BDCOM P3310B EPON Installation Manual...

Page 2: ...Device 9 Chapter 3 Installing BDCOM P3310B EPON Device 10 3 1 Installation Flow of BDCOM P3310B EPON 10 3 2 Installing the Machine Box of BDCOM P3310B EPON 10 3 2 1 Installing the Machine Box on the...

Page 3: ...ing LINK ACT indicators 1000M optical electrical port Electric port 1000M rate MDI MDIX auto identification UTP RJ45 port and the LINK ACT indicators SFP port having LINK ACT indicators ETH Electric p...

Page 4: ...the data is being transmitted 13 PON3 LINK LED of PON3 LINK If this LED is on it means that ONU is connected 14 PON3 ACT LED of PON3 ACT If this LED flickers it means that the data is being transmitt...

Page 5: ...the indicator flickers the data is received or transmitted through the port 25 Console Console port Realizes the local management of the EPON access device 25 MGMT Network management port Realizes the...

Page 6: ...v2 Network management standard RFC 1157 SNMP v1 v2 RFC 1213 MIB II RFC 1757 RMON 1 2 3 9 Memory EPROM 512 Bytes Flash Memory 8M Bytes SDRAM 128MBytes Standard configuration One Console port 1 gigabit...

Page 7: ...BDCOM P3310B EPON Installation Manual 1 3 ROHS Description 5...

Page 8: ...the power line keep the power line horizontal with the power socket 2 When the lifetime of our products ends handle them according to national laws and regulations or send these products to our compa...

Page 9: ...e power source z When the power is on do not touch the power z Correctly connect the device and the power socket z Only professionals are allowed to operate and maintain the device z Read the installa...

Page 10: ...ol plate will cause maintenance problems systematic faulty and breakdown For location planning and device locating refer to section 2 3 2 Location Configuration Prevention 2 3 2 Location Configuration...

Page 11: ...lled if necessary At least a 240 V 10A fuse or a breaker is provided in the phase line if you prepare the short circuit prevention measures for a building Caution If the power supply system does not h...

Page 12: ...0B EPON 3 2 Installing the Machine Box of BDCOM P3310B EPON The machine box of BDCOM P3310B EPON can be installed on the desk or can be fixed to other cabinets Your network installation requirements c...

Page 13: ...DCOM P3310B EPON is fixed on the cabinet through the brackets When you fix the brackets the front faceplate of BDCOM P3310B EPON faces forward The detailed operations are shown in Figure 3 1 Figure 3...

Page 14: ...host The communication parameters of the terminal serial port can be set to a rate of 9600bps eight data bits one stop bit no sum check bit and traffic control The RJ45 connector of the console port...

Page 15: ...n the super terminal The cable is used to connect the console port of BDCOM P3310B EPON and the outside console terminal device One end of the cable is a 8 pin RJ45 plug and the other end is a 9 hole...

Page 16: ...If the indicator is always on the port is normally linked if the indicator flickers the data is forwarded through the port To use the optical port you need connect it to the SFP optical module and the...

Page 17: ...ss cable through the UTP port of the EPON access device In this case the corresponding optical port cannot be used The numbering order of the pins in the UTP port is the same as the console port Figur...

Page 18: ...devices 3 4 Checking After Installation After BDCOM P3310B EPON is installed please conduct the following checkups before it is powered z If the EPON access device is installed on the cabinet check wh...

Page 19: ...ols and operation methods Caution When the power cable still connects the power source do not touch it When you open the cover the EPON access device you may use the following tools These tools are z...

Page 20: ...e cover and close the chassis Do as follows 1 Put them well according to their locations and joint them together along their sides 2 See the following figure 3 When the cover and the bottom are closel...

Page 21: ...n Locations The temperature of the locale where the EPON access device runs should be from minus 40 to 85 Celsius degree z If the EPON access device cannot be started and the PWR indicator is off chec...

Page 22: ...cator is always on the system is being started If the indicator flickers the system works normally 3 None Indicator of each port If the indicator is always on the link on the port is normal If the ind...

Reviews: