Mounting instructions 

novotegra for flat roofs 

closed II / East-West II 

 

 

 

 

 

 

 

Summary of Contents for novotegra closed II

Page 1: ...I Mounting instructions novotegra for flat roofs closed II East West II...

Page 2: ...1 Required for installation 4 4 2 Installation system components installation variants 5 4 3 Installation system components optional 6 5 Installing the substructure 7 5 1 Installing the base rails and...

Page 3: ...lt WARNING describes a potential danger If it is not avoided death or serious injury might result CAUTION describes a potential danger If it is not avoided light or minor injury might result NOTE desc...

Page 4: ...ance lengths of bolts overhang and protrusions must be determined by the static calculation using the design software Solar Planit de The permissible roof inclination for the use of the mounting syste...

Page 5: ...the PV system the building owner and the specialist roof sealing company The substructure is installed without penetrating the roof The PV system is secured against wind suction by providing ballast e...

Page 6: ...Product group Base trough 150 30 Material Aluminium Profile rail Base trough connector set 150 30 I Material Aluminium Tool Socket bit AF 8 mm Rail connectors and expansion joint Base trough expansio...

Page 7: ...ace replace tool base trough 150 30 For place replace of base foot and module supports set in the base trough 150 30 Correct installation 4 2 Installation system components installation variants Figur...

Page 8: ...m Material Aluminium Module protection and rail top cover Self locking cable tie Cable protection Cable clip d 10 mm Cable protection Grounding connector set AF 18 Material V2A Tool Special lock nut A...

Page 9: ...nt eM module length 12 mm Observe the accident prevention regulations when sawing Connecting the base troughs Push the ends of the base troughs tightly together push the connectors under the ridge on...

Page 10: ...tion for East West II see MV 8 Wire adjacent modules while installing them Install the string cable first Fastening the modules on the row end Secure modules at the end of a row or at a break in the r...

Page 11: ...modules The required ballast depends on the system area and is specified in the ballast plan in kg and or number of stones The ballast can be laid out under in front of or behind the module to accommo...

Page 12: ...tightened Approval from manufacturer required for clamping in the corner section of the long frame side MV 3 Base troughs for cross drainage If the base troughs 150 30 for cross drainage end without P...

Page 13: ...module in addition to the clamps at the corners using the flat roof end clamp on the long side 1 Secure wind deflector with one screw at base trough and module support MV 7 Module supports East West...

Page 14: ...ind deflector module support 1 Lay the wind deflector under the module The module and wind deflector should be fastened to the support with flat roof end clamps short side and attached to the base tro...

Page 15: ...k Push component through long hole in the base trough Push ground wire through the opening suitable for 6 10 mm and attach the component with the self locking nut Ground wire tightening torque 20 Nm O...

Page 16: ...fication of the slip safety of PV systems on flat roofs on site Friction coefficients determined on site may be taken into account and must be provided to BayWa r e Solar Energy Systems GmbH for the c...