
CHAPTER THREE
INSTALLATION
3-1
Introduction
3-1-1
This chapter explains how to locate information regarding installation of the CLINITEK?ATLAS?Rack
Sample Handler.
3-2
Installation
Refer to the Clinitek Atlas Automated Urine Chemistry Analyzer with Rack Sample Handler
Operating Manual, part number 99950239, Section 2, for instructions on installing this system.
3-2-1
In addition to the instructions in the operating manual, the following should be checked during the
installation:
1.
the waste tubing from the Clinitek Atlas system Rinse Well to the waste bottle must be fixed to
the rear wall without any sag. If there is a sag or stagnation of waste water in the waste tubing,
waste water may over-flow from the Rinse Well and electrical problems may then occur with the
Rack Sample Handler unit.
2.
The waste tubing must have a little slope towards the left side wall of the Atlas unit. The tube
end of the waste tubing must be cut so as to not touch the surface of the waste container, even
if this waste container becomes full.
3.
the system must be placed on a flat, stable and level surface for optimum performance.
NOTE:
If problems are seen during an initial installation, the Mother PC Board connectors
may have come loose. See paragraph 9-6 on page 9.13 to access these connectors.
Then reseat all the connectors, using the paper guide printed on top of the card cage
and Figure 6-7 on page 6.9
3-1
Summary of Contents for Clinitek Atlas
Page 1: ...Clinitek Atlas Rack Sample Handler Service Manual Cover...
Page 14: ...CHAPTER FOUR OPERATIONS PROCEDURES SUMMARY Figure 4 1 Main Menu Operation Block Diagram 4 1...
Page 20: ...Figure 6 2 Cross Feed Assembly 6 3...
Page 22: ...Figure 6 4 Power Module Figure 6 5 The Interconnect PC Board and R1 Relay 6 5...
Page 24: ...Figure 6 6 The Card Cage Assembly 6 7...
Page 26: ...Figure 6 8 The CPU PC Board Figure 6 9 The I O PC Board 6 9...
Page 37: ...Figure 7 1 Service Mode Block Diagram 7 3...
Page 39: ...Figure 7 2 Without Tube Run Routine and With Tube Run Routine 7 5...
Page 41: ...Figure 7 3 Barcode Test 7 7...
Page 46: ...Figure 7 5 Output Test Figure 7 6 Display Test 7 11...
Page 66: ...Figure 8 5 Adjusting Tube Sensor PH4 8 6...
Page 72: ...CHAPTER NINE REPAIR REPLACEMENT 9 1...
Page 73: ...Figure 9 1 Removing the Covers Part One Figure 9 2 Removing the Covers Part Two 9 2...
Page 75: ...Figure 9 3 The Return Feed Assembly 9 4...
Page 77: ...Figure 9 4 The Rack Feed Assemblies In Feed Out Feed 9 6...
Page 79: ...Figure 9 4 The Rack Feed Assemblies In Feed Out Feed 9 8...
Page 81: ...Figure 9 4 The Rack Feed Assemblies In Feed Out Feed 9 10...
Page 83: ...Figure 9 5 The Main Chassis Assembly 9 12...
Page 85: ...Setting the Timing Belt Deflection Figure 9 7 The Cross Feed Assembly 9 14...
Page 87: ...Figure 9 8 Proper Installation of Wire Cables on Winding Drums 9 16...
Page 89: ...Figure 9 10 Removing and Replacing the Transfer Plate 9 18...
Page 91: ...CHAPTER TEN PARTS BREAKDOWN ILLUSTRATED ASSEMBLIES 10 1...
Page 94: ...Figure 10 1 Stat Tube Holder Assembly 10 4...
Page 96: ...Figure 10 2 Stat Tube Holder Covers 10 6...
Page 98: ...Figure 10 3 Return Feed Assembly 10 8...
Page 101: ...Figure 10 4 Rack Feed In Feed Out Feed Assembly 10 10...
Page 103: ...10 4 32 Cap Screw M4 x 18 4 10 4 33 Spring Washer 4 1 10 4 34 Plain Washer 4 4 10 11 a...
Page 104: ...Figure 10 4 Rack Feed In Feed Out Feed Assembly 10 12...
Page 106: ...Figure 10 5 Display Assembly 10 14...
Page 108: ...Figure 10 6 Power Module Switch Box 10 16...
Page 118: ...Figure 10 15 Main Chassis Assembly 10 26...
Page 120: ...Figure 10 16 Cross Feed Assembly 10 28...
Page 124: ...Figure 10 19 Main Chassis Unit Frames 10 32...
Page 126: ...Figure 10 20 Frame Assembly 10 34...
Page 132: ...Figure 10 25 Additional Parts Part 1 10 40...
Page 134: ...Figure 10 26 Additional Parts Part 2 10 42...
Page 136: ...Figure 10 27 Additional Parts Part 3 10 44...
Page 138: ...Figure 10 28 Additional Parts Part 4 10 46...
Page 140: ...Figure 10 29 Additional Parts Part 5 10 48...
Page 142: ...Figure 10 30 Covers Part 1 10 50...
Page 144: ...Figure 10 31 Covers Part 2 10 52...
Page 154: ...11 6 a...
Page 157: ...Figure 2 Installing Drill Fixture and Drilling Holes 11 9...
Page 163: ...11 14 a...
Page 168: ...Figure 3 Setting the Belt Tension 11 19...
Page 170: ...Figure 4 Setting the JP1 Jumper on the Power Driver PC Board 11 21...
Page 172: ...SCHEMATICS 12 2...
Page 173: ...Figure 1 System Block Diagram 12 3...
Page 174: ...Figure 2 AC DC Power Circuit 12 5...
Page 175: ...Figure 3 Cables and Assembly Wiring Number 1 12 7...
Page 176: ...Figure 4 Cables and Assembly Wiring Number 2 12 9...
Page 177: ...Figure 5 Cables and Assembly Wiring Number 3 12 11...
Page 178: ...Figure 6 Cables and Assembly Wiring Number 4 12 13...
Page 179: ...Figure 7 Atlas Interconnect PC Board 12 15...
Page 180: ...Figure 8 Cable Assemblies Number 1 12 17...
Page 181: ...Figure 9 Cable Assemblies Number 2 12 19...
Page 182: ...Figure 10 Cable Assemblies Number 3 12 21...
Page 183: ...Figure 11 Driver PC Board 12 23...