
Ipump Pain Management System Operator’s Manual
7-4
CD07-19-E4-766
Preventive Maintenance Checklist
The following is a schedule of basic maintenance tasks that should be performed on the device.
Cleaning and Inspection
Perform as required, but recommended after every use.
NOTE:
Clean using one of the recommended cleaners listed in Table 7-1 on page 7-2.
Check
Action
Housing
Clean housing and front panel as recommended in “Cleaning the Pump,” 7-1. Check for cracks or large dents.
Tubing door
Verify that the tubing door opens freely and that the latching mechanism operates properly when the door is closed.
Labels
Clean as recommended in the cleaning instructions. Check for scratches, cuts, or obliterated words.
AC adapter
Verify that the optional AC adapter is undamaged over the entire length of the cord and the molded plugs.
Cover
Clean as recommended in “Cleaning the Pump,” 7-1. Ensure that the cover is intact, fits properly when closed and
locked, and has no obvious cracks or fractures.
Pole clamp
Operates freely throughout range of motion. Check that the pump stays on IV pole.
PCA button and cord Clean as recommended in “Cleaning the Pump,” 7-1. Ensure that the cord is intact and has no cuts or missing
insulation, and that the connector and the PCA button are securely attached to the cord.
Oct02_0719E4766.book Page 4 Friday, August 3, 2007 1:46 PM