![Baxi ECOGEN 24/1.0 Installation & Servicing Instructions Manual Download Page 34](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788034.webp)
Fig. 24
Fig. 25
Fig. 26
page 33
9.2 Fitting The Boiler
1. Using a suitable lifting device, lift the appliance on its base packaging. Offer the appliance up to the wall plate and engage the bottom edge of the back of the appliance on
to the wall plate (
).
Ensure that there is adequate clearance for the lifting equipment (see
).
2. Push the appliance back onto the wall plate and engage the securing nuts at the top of the appliance by sliding to the right and swinging down (
).
3. Tighten the two securing nuts on the wall plate and complete the securing of the appliance by replacing the two screws previously removed. (
).
4. Remove the base packaging.
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...