6.0 Legislation
9
© Baxi Heating UK Ltd 2015
6.1
Installation, Commissioning, Service & Repair
1. This appliance must be install in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.
2. In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.
3.
Definition of competence:
A person who works for a Gas
Safe registered company and holding current certificates in the
relevant ACS modules, is deemed competent.
4. In IE (Eire), this must be carried out by a competent person
as stated in I.S. 813 “Domestic Gas Installations”.
All Gas Safe registered engineers carry an ID card with their
licence number and a photograph. You can check your
engineer is registered by telephoning 0800 408 5500 or online
at www.gassaferegister.co.uk
The boiler meets the requirements of Statutory Instrument
“The Boiler (Efficiency) Regulations 1993 No 3083” and is
deemed to meet the requirements of Directive 92/42/EEC on
the energy efficiency requirements for new hot water boilers
fired with liquid or gaseous fuels:-
Type test for purpose of Regulation 5 certified by:
Notified Body 0085.
Product/Production certified by:
Notified Bodies 0086.
For GB/IE only.
6.2
Benchmark Commissioning Checklist
1. Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that you
have signed it to say that you have received a full and clear
explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and Wales).
2. All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate will
then be issued to the customer who should, on receipt, write
the Notification Number on the Benchmark Checklist.
3. This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer should
complete the relevant Service Record on the Benchmark
Checklist after each service.
4. The Benchmark Checklist may be required in the event of
any warranty work.