background image

Summary of Contents for Bavaria 37 - 2 cabins

Page 1: ...I I _ 1 I 1 1 I I I i Ill I i i II I I I l _ Hn I i 1 1 I I 1 il i I J m 1 1 1 1 I 1 1 I I J Sailing yacht BAVARIA 37 2 cabins BAVARlA YACHTS Bavaria Yachtbau GmbH industriestra13e 11 D 97232 Giebels...

Page 2: ...Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC installation 2 5 2 DC installation 2 5 3 Operating the insta...

Page 3: ...cteristics of a motor yacht please make sure you get proper training before you put it into operation Do not hesitate to contact the dealer or our shipyard for information about further training possi...

Page 4: ...f construction and equipment with the Directive itself but stability and buoyancy is checked by another notified body Lloyd s Register Quality Assurance GmbH Yacht Services in Hamburg a 100 subsidiary...

Page 5: ...formity of the yacht with all provi sions of the Directive The sequence of digits is the code number of the certifying body in this case the Lloyd s Register Quality Assurance GmbH Yacht Services see...

Page 6: ...uirements of the European Recreational Craft Directive This declaration will lose its validity if anyone carries out changes on board which touch the essential safety requirements and are not settled...

Page 7: ...he CEmarking Thi certification ill issued to Applicant Boat type Module Hull length Mmiufacturer max recommended load Max number of persons Manufactured by Specified standardJ Certifkate no Dateofis l...

Page 8: ...uoyancy and flotation 12217 Part 2 3 4 Openings in the hull 12216 9093 3 5 Flooding 11812 12217 12216 8849 15083 3 6 Manufacturer s maximum recommended load 14946 3 7 Place for life rafts Sicherheitsr...

Page 9: ...stallation 11 10 m 3 68 m 1 35 m shore connection option socket CEE plug current operated 230 110 V earthed socket battery charger option 230 110 V AC 12 V DC with 48 A max current option 12 V DC syst...

Page 10: ...ent 1 2 1 Rigging plan BACKSTAY 5 Reference E 4 10 I I I I I I I I I I I I I I I I I I I I I I J I I Bavaria Yachtbau GmbH The valid measuring of the foresail reefing gear are on the enclosure note at...

Page 11: ...Sailing yacht Bavaria 37 2 cabins Bavaria Yachtbau GmbH 1 2 2 Deck arrangement 11 39...

Page 12: ...ck 2 27 Aft endstop g track Achteres Schienenendsttick mit Umlenkblock 2 28 Endstops mainsheet track Schienenendkappe 2 29 Genoa winch Genuawinde 2 30 Stopper Stopper 8 31 Halyard winch Fallwinde 2 32...

Page 13: ...Sailing yacht Bavaria 37 2 cabins Bavaria Yachtbau GmbH 1 2 3 Accommodation plan I 1 I i 13 39...

Page 14: ...upper shroud Running Rigging Inside the mast Main halyard Genoa halyard Boom lift 3 additional tripping lines 2x 2x 2x permanent backstay permanent backstay bridle 7x 19 braid permanent backstay tackl...

Page 15: ...OSTE 11 MOTORINSTRUMENTENTAFEL 12 MOTOR FERNBEDIENUNGSKAB EL 13 MOTOR BELUEFTUNGSROSTE 14 VORRATGEBER FUER KRAFTSTOFFTANK M IJQ t ENGINE VOLVO MD 2030 ENGINE EXHAUST SYSTEM EXHAUST WATERLOCK r FEED BA...

Page 16: ...a hose connection leading to the pressure water pump This pump estab lishing the complete cold water circulation is fitted below the pantry An interruption of the operation of the pressure pump is do...

Page 17: ...2 Sea water circulation Sea water is necessary for both WC flushing and engine cooling see 2 9 2 1 3 WC installation see enclosed directions for use Attention If you are not aboard for a longer time y...

Page 18: ...suspended balanced hydrofoil midship rudder It is operated by hand from the steering wheel at the steering post in the cockpit Transmission of power is realised by means of rope pulls and fairleads t...

Page 19: ...necessary 2 4 Bilge pumps bilge pipes The chain locker is made watertight towards the yacht It is self bailing through two holes in the skin All BAVARIA yachts have got a self bailing cockpit The dra...

Page 20: ...Sailing yacht Bavaria 37 2 cabins Bavaria Yachtbau GmbH Components of the bilge pumping installation 20 39...

Page 21: ...n of additional electric devices There are only automatic fuses used So you only have to press them in case of a breakdown If a fuse blows repeatedly you should spot the cause or consult a spe cialist...

Page 22: ...ration you must not discon nect the 12 V charging circuit Before starting a voyage you should always check the battery voltage the correct function of navigation lights Have spare lamps for all naviga...

Page 23: ...w I _ w 0 19 20 34 26 Kabine Cabin 25 39 38 Kabine Cabin 13 33 24 6 22 11 12 33 28 14 16 15 Kartentisch Chart table 29 Sitzgruppe Seating 6 2 1 8 10 VI 0 r I a 0 0 I Q r r 1 s rQ g to I J J N to i 0...

Page 24: ...option Batterie ladegerat Option 1 lx10 2x2 5 17 Electric panel Elektro Paneel 1 18 Main switch Batteriehauptschalter 1 95 19 Auto pilot option Autopilot Option 1 2 X 2 5 20 Electronic compass option...

Page 25: ...uct plate triple d isplay no 28029400 t 1 F 2 Q J Q y25 r r 1 5 7A 5 511 li A 6 ff L A A g a 10 l S B 11 1 51 1 u1 n1 11 1 51 1 02 fl L 2_5gl T 51 FTJ A 1 1 5 s Fl s 16 1i A distribution 230V 50Hz 1 5...

Page 26: ...or term a the distrib pan tank II f 1A I 11lA lll 1CA 11 1QA 12 1 4 14 4 s 11A i Oq nm iQ qmm __ _ Gw tMA tank I Mal coupling plug 8 Fuzes ha e to fasten neer negatwe pde d the batteries tt namo L 10...

Page 27: ...ailing yacht Bavaria 37 2 cabins 2 5 9 AC distribution i I I I Ii 1S lt a in V CIWI 11 1 I CJ I Bavaria Yachtbau GmbH I I I j I V iilB I J ft C ti al 0 a i u I U Ma C Ii I C C MG __ __ j IVI ___ 27 39...

Page 28: ...o be replaced after the expiry date The reducing valve in the gas cylinder casing has a service pressure of 30 mb The flow rate is 1 kg h 2 6 1 The components 2 6 2 Operation Gas installations require...

Page 29: ...lace them if they a defective 2 7 Fire protection When building the yacht special attention was payed to avoid the risks of fire This includes the choice of materials the distance of stove flames to t...

Page 30: ...xtinguishers regularly Train yourself as regards fire fighting Consider always the seamanlike care duty 2 8 Anchor option The bower anchor plough anchor abt 17 kg hot galvanised is known for its high...

Page 31: ...ase an visual and acoustic warning In this event you should stop and switch off the engine immediately until the problem has been settled see manual of the engine manufacturer Attention A regular Insp...

Page 32: ...he tightness of board ducts should be inspected regularly Check and retighten all hose clips and stuffing boxes of valves if necessary Note In case of spherica l valves a transverse lever direction in...

Page 33: ...e wet exhaust pipe of the diesel engine reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you sh...

Page 34: ...tems For ships sailing in salt waters remains of salt absorb water and can cause a faster corrosion Where and whenever it is possible you should rinse the yacht and parts of it with fresh water 4 2 We...

Page 35: ...er s sacrificial anode if necessary Empty all cooling water of the engine and follow the instructions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter stora...

Page 36: ...skipper to introduce his crew into their operation Those being prepared for an emergency are normally never involved But just in case the yacht is prop erly equipped for those situations with suitable...

Page 37: ...assurance board with corresponding operating instruction gas test document with corresponding working instruction release checklist leaflets and description of production work working instructions han...

Page 38: ...ract 1 First launch 2 Date of delivery to the owner 3 Type of boat 4 Hull identification number 5 Commission number 6 Name of the yacht 7 Manufacture and type of engine 8 Engine number 9 Gear manufact...

Page 39: ...Please return signed to address of the dealer Acknowledgement of receipt Name Address Owner of the yacht BAVARIA 37 HIN This recreational craft gets the warranty mentioned with the yacht This warrant...

Reviews: