Transportation, Unpacking
Mono Power Unit BUM 62 T
17
Baumüller Nürnberg GmbH
5.99009.03
4
T
RANSPORTATION
, U
NPACKING
The units are packed at the factory in accordance with the order.
Avoid strong shaking during transportation and shocks, e.g. when setting the units down.
After unpacking the units and checking that the shipment is complete and undamaged, you can start
assembly.
The packing consists of fibreboard, corrugated cardboard and/or wood. It can be disposed according to
the local regulations.
Report any transport damage without delay.
DANGER
If you detect a transport damage on the unit, it must not be connected unless an appropriate voltage
test has been carried out.
Ignoring this information can result in death, severe personal injury or considerable damage to
material assets.
Summary of Contents for BUM 62 T
Page 1: ...E 5 99009 03 Manual BUM 62 T Mono Power Unit ...
Page 6: ...6 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 10: ...Safety notes 10 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 18: ...Transportation Unpacking 18 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 22: ...Assembly 22 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 48: ...Installation 48 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 62: ...Commissioning 62 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 66: ...Maintenance 66 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 73: ......