A
SSEMBLY
AND
INSTALLATION
This chapter describes the mechanical assembly and electrical installation of the b maXX
safe PLC.
The assembly and installation process consists of the following steps:
1
Assemble the module.
2
Connect the module to the power supply.
9.1
General safety regulations
h
Follow the information in the chapter
CAUTION!
The "Installation checklist" reproduced in Appendix
on page 105 should be
used during the assembly and installation phase.
m
Make sure that the installation process is carried out entirely in accordance with
the installation and wiring plan.
m
Conduct a visual inspection and check all system components for visible damage.
m
Check the system for wiring errors.
m
Inspect the tightening torque and make sure that the electrical connection is not
interrupted by insulation material.
m
Inspect the tensile-load capacity of the electrical terminal and screw connections.
m
Make sure that the installation and cable routing are carried out in accordance with
applicable standards and guidelines.
m
Make sure that the system’s environmental properties specified in Appendix
on page 110 are not exceeded.
m
Make sure that the design of the system’s type of protection is sufficient.
m
Make sure that the safety system is not damaged by moving parts or work in the
area surrounding the installed safety components.
m
Make sure that the system components do not come into contact with aggressive
substances (such as acids, bases, transmission oil).