Commissioning
Operation Manual
b maXX safe PLC
BMC-M-SAF-02
Document no.: 5.07020.04
69
11
X:
LED status user-defined
11.8 Commissioning procedure
The commissioning process is divided into the following sections:
1
Switching on.
2
Testing the function.
11.8.1 Switching on the BMC-M-SAF-02
m
Read and observe the
m
The “Assembly and installation” section will have to have been conducted properly.
m
Position the S2 switch/button on the b maXX safe PLC on "STOP" (middle position).
m
Switch the +24 V DC of the voltage feed on.
LEDs
Meaning
H1 H2 H3 H4
⊗
X
X
X
Control in RUN
X
X
X
Control in STOP
X
⊗
X
X
Error in the control has occurred
X
X
X
Control status OK
X
X
⊗
X
BLINKING: Inserted CF card detected during start-up or safety
code entry is running
X
X
X
⊗
BLINKING: Copy code entry is running
X
X
⊗
X
STEADY: Copying process from card to control running, LED goes
out once the copying process is complete
X
X
X
⊗
STEADY: Copying process from control to card, LED goes out once
the copying process is complete
X
X
X
⊗
Error has occurred during the copying process.
CAUTION!
Damage through electrical destruction.
You may not connect the b maXX safe PLC module with other system components
or separate it from other system components when the +24 V DC of the voltage feed
is on.
Therefore:
m
Switch off the +24 V DC of the voltage feed of the power supply beforehand.