Post Hole Digger BPX900
E&OE
©2017 Bäumr-AG
26
Transportation and Storage
Always ensure that the machine is cool enough to touch before transporting or
storing. • Petrol/fuel/gasoline is extremely flammable – keep clear of naked flames or
other ignition sources. • Always transport the machine with the engine ON/OFF switch in the "OFF" position.
• Drain the fuel tank before transportation or storage.
Preparing for Transport and Storage
•
Drain the fuel system by allowing the engine to run until it stops.
•
Ensure the engine ON/OFF switch (if equipped) is in the "OFF" position.
•
Disconnect the spark plug lead.
•
Avoid exposing the equipment to direct sunlight, particularly during transportation.
•
Ensure the equipment is secure and upright during transport.
•
Store the unit in a dry, well-ventilated area and out of the reach of children.
Long Term Storage
Follow the normal procedures for storage, then:
•
Drain the fuel system. It is advised to have the fuel tank as empty as possible before draining.
c. Unscrew (rotate left) the carburettor drain plug. Use a suitable container to catch the draining fuel,
and allow the fuel to drain. Store the drained fuel in a properly sealed container.
d. Re-install (rotate right) the carburettor drain plug and tighten.
•
Remove the spark plug and put 5ml of clean engine oil into the cylinder. Pull the starter cord slowly to
distribute the oil. Re-install the spark plug.
•
Cover the equipment to protect it.
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG