6
Commissioning
Personnel:
n
Owner
In certain countries and regions, inspections must be carried out or
authorization obtained before commissioning the equipment.
1.
Ensure that you are aware of the local regulations.
2.
Please refer to the authorities and institutes responsible
before beginning production if authorization is required.
6.1 Preparing test material for commissioning
Personnel:
n
Owner
In order to ensure that the commissioning process is successful,
you must ensure that sufficient test material is available that is typ-
ical of the operator's production spectrum, for example: printed
sheets or folding carton blanks. These must demonstrate all of the
features that should be checked as part of the commissioning
process. The products must be manufactured to be suitable for
continuous production.
1.
For the commissioning process, use products that are repre-
sentative of the product spectrum. Also include borderline
cases, such as the smallest and largest formats.
2.
Have a sufficient amount of products ready for the time the
commissioning process begins.
3.
Inform the commissioner about the features and quality cri-
teria of these products.
6.2 Commissioning ULT 400 XL
6.2.1 Sensor ULT 400 XL
NOTICE!
Damage due to removal of sensor under voltage
Removing the sensor from the system control cabinet
under voltage may damage the electronics or cause a
data loss.
–
Only remove the sensor from the system control
cabinet when the cabinet is switched off.
–
Only remove the sensor from the system control
cabinet when the cabinet is switched off.
The sensor can only be operated as a component within a system.
Observe the operating company’s specifications and the settings
for the overall system, as well as all safety information and descrip-
tions within this operating manual, during commissioning.
Regulatory framework conditions
for the owner
Preparing products
Commissioning
Commissioning ULT 400 XL > Sensor ULT 400 XL
04.05.2021
ULT 400 XL
35