MAINTENANCE
BG 25 / 2011 /
2254_BG25_en_0000498763_V01
9 - 3
9.3.2
Components
Table Attachment
Components
Maintenance interval
Operation
10 h
daily
50 h
weekly
250 h
monthly
500 h
3 months
1000 h
yearly
2000 h
yearly
3000 h/
every
2 years
Note
Masthead
- Check that the connecting
bolts and screws for the
mast, if provided, are
firmly screwed in;
tighten screws
X*
- Replace connecting bolts for
the mast, if provided
10000 hrs
Mast
Mast
- Lubricate guide rails
X
- Check that the connecting
bolts and screws between the
mast sections, if provided, are
firmly screwed in;
tighten screws
X*
- Replace connecting bolts between
the mast sections, if provided
5000 hrs
Mast prop
- Ensure that bolt safety mecha-
nism
and bolts are screwed in tightly
X
- Lubricate pivot mount
X
Ladder on mast**
-
Check that the mounting bolts are
firm
X
- Check transition between the
parts of the mast ladder
X
- Check fall protection equipment
for function
X
Mast pivot
- Lubricate mast pivot
X
- Lubricate mounting bolts
X
- Check flange bolts are firmly
screwed in, tighten bolts
X*
- Replace flange bolts
10000 hrs
* Only during running-in period
**
Not supplied with this version