MNL-0391
April 26, 2007
Page 33
BAUER
COMPRESSORS
CHAPTER 4:
JRII MAINTENANCE
4.1
Maintenance Record
It is recommended that all maintenance work be recorded in a service record book which shows the date
and details of any maintenance work carried out. It will help avoid expensive repairs caused by missed
maintenance work. If necessary to claim against the warranty, it will help to have proof that regular
maintenance work has been carried out and the damage is not the result of insufficient maintenance.
4.2
Maintenance Schedule
As an example for the service record book the following Maintenance Schedule and Record of Operat-
ing Hours are provided. They may be reproduced as needed. The grey heading boxes on the Mainte-
nance Schedule show the recommended maintenance interval and the Section of this manual for the
applicable maintenance procedure. Date and signature blocks are also provided
^ WARNING ^S
Always shut down and decompress the complete system prior to carrying out any work on the compressor
Never repair pressure lines by soldering or welding.
^ CAUTION ^S
Change the purifier cartridge according to the Maintenance Schedule.
The used purifier cartridge must be disposed of according to local regulations.
Use only original spare parts for maintenance or repair work.
Check the entire system for leakage by brushing all fittings with soapy water or leak test spray.
4.2.1
After the First 25 Operating Hours
Date
Signature
Check functioning and tightness of fill valve.
Clean intake filter and intake filter cartridge.
Check V-belt tension and condition.
Check tightness of all connections and couplings
Check cooler brackets
Check zero position on final pressure gauge when the
system is depressurized.
Tighten all valve head bolts and studs.