background image

Assembly Instructions

Flexi-News™ quad B001650 

1.

2.

3.

4.

First, take base (

A

) and ensure brakes are 

applied to the two castors that have them.  
Braked castors are at opposite corners of 
base.

With the base locked in place, drop the first 
RH panel (

C

) into the base (

A

) as shown above.

Secure in place with x2 thumb screws (

G

).

Next postion the first LH panel (

B

) in place 

and secure with x2 thumb screws (

G

). 

5.

6.

Repeat steps 2-5 to install the remaining 
set of LH and RH panels as shown above.    

Secure both panels to the upright tab on the
base with x2 thumb screws (

G

).  Ensure the 90°

returns of both panels sit on the same side of 
the upright tab on base (

A

) as shown.

Next secure the panels together at the top using
x2 plastic rivets (

H

).  The plastic rivet (

H

) is a 2

piece component that secures the panels when
pressed together from both sides.

Tel: 0113 244 5524  Fax: 0113 244 6664  email: [email protected]  web: www.bartuf.com

All dimensions are approximate and may be subject to change. 
All drawings and designs are protected by design right and copyright© 
Patents GB 2293538B.GB 2317328  US 6,112,912

A

x2

x2

C

C

B

B

x1

x2

x4

x2

x8

x12

x2

x4

G

H

G

Reviews: