Assembly Instructions
Flexi-News™ quad B001650
1.
2.
3.
4.
First, take base (
A
) and ensure brakes are
applied to the two castors that have them.
Braked castors are at opposite corners of
base.
With the base locked in place, drop the first
RH panel (
C
) into the base (
A
) as shown above.
Secure in place with x2 thumb screws (
G
).
Next postion the first LH panel (
B
) in place
and secure with x2 thumb screws (
G
).
5.
6.
Repeat steps 2-5 to install the remaining
set of LH and RH panels as shown above.
Secure both panels to the upright tab on the
base with x2 thumb screws (
G
). Ensure the 90°
returns of both panels sit on the same side of
the upright tab on base (
A
) as shown.
Next secure the panels together at the top using
x2 plastic rivets (
H
). The plastic rivet (
H
) is a 2
piece component that secures the panels when
pressed together from both sides.
Tel: 0113 244 5524 Fax: 0113 244 6664 email: [email protected] web: www.bartuf.com
All dimensions are approximate and may be subject to change.
All drawings and designs are protected by design right and copyright©
Patents GB 2293538B.GB 2317328 US 6,112,912
A
G
x2
G
x2
C
C
B
B
x1
x2
x4
x2
x8
x12
x2
x4
G
H
G