Operation the measuring system
55
PETRO 3003 VOLUTANK Operating Instructions, Software version pyramid 2.5.19, BA 151014 (04.12.2020)
4.5.2
Loading
The basic procedure for loading is described in section 4.2.
After receiving the order data, the loading plan is displayed in accordance with
the loading order.
● Confirm this data.
In the following window, only the softkey for starting the loading order is avail-
able.
● Touch the "Load" softkey. The loading menu is displayed.
After transferring the preset data, the product names for the compartments to
be loaded are adopted. It is not necessary to assign the products via the
product mapping.
● Load the compartments with the products provided in the loading plan.
Follow the regulations for loading in accordance with the operating instructions
for the vehicle!