94
Maintenance
CFPP Process Analyzer CFPP-4.2 03/2016
Fig. 10.17: Adjusting the outlet pipe
3 Bypass pipe
•
If the liquid level was below the level mark, screw the outlet pipe (1) further in (one
turn corresponds to 1.25 mm).
•
If the liquid level was above the level mark, screw the outlet pipe (1) further out (one
turn corresponds to 1.25 mm).
•
Secure the outlet pipe with the lock nut while holding it in position.
•
By the same procedure, adjust the bypass pipe (3) so that the distance from the
outlet pipe is about 15 mm.
The liquid level is adjusted.
10.15 Reinstalling the Measuring Cell
!
CAUTION!
The transparent plastic of the measuring cell is not alcohol-resistant, it will
be damaged by contact with alcohol. FOR THIS REASON:
-
Do not clean the transparent plastic parts with alcohol.
3
Summary of Contents for CFPP-4.2
Page 1: ...CFPP Process Analyzer CFPP 4 2 Operating Instructions 395778MDHEN A 03 2016 ...
Page 6: ...IV Contents CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 7: ...General 5 03 2016 CFPP Process Analyzer CFPP 4 2 1 General ...
Page 9: ...Safety 7 03 2016 CFPP Process Analyzer CFPP 4 2 2 Safety ...
Page 25: ...Introduction 23 03 2016 CFPP Process Analyzer CFPP 4 2 3 Introduction ...
Page 28: ...26 Introduction CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 29: ...Technical Data 27 03 2016 CFPP Process Analyzer CFPP 4 2 4 Technical Data ...
Page 33: ...Analyzer Description 31 03 2016 CFPP Process Analyzer CFPP 4 2 5 Analyzer Description ...
Page 46: ...44 Transport Packaging and Storage CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 55: ...Initial Operation 53 03 2016 CFPP Process Analyzer CFPP 4 2 8 Initial Operation ...
Page 64: ...62 Initial Operation CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 65: ...Operation 63 03 2016 CFPP Process Analyzer CFPP 4 2 9 Operation ...
Page 69: ...Maintenance 67 03 2016 CFPP Process Analyzer CFPP 4 2 10 Maintenance ...
Page 102: ...100 Maintenance CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 103: ...Troubleshooting 101 03 2016 CFPP Process Analyzer CFPP 4 2 11 Troubleshooting ...
Page 107: ...Troubleshooting 105 03 2016 CFPP Process Analyzer CFPP 4 2 ...