13
Demineralizer Treated Boiler Feed
See Figure 8. (Must have optional still adapter kit: Catalog No.
440376)
1.
Install a customer supplied shutoff valve onto your
tap water source. Thread the solenoid valve onto
your customer supplied shutoff, with the side
marked “in" toward the shutoff.
2.
Install the fitting supplied with the still adapter kit
into the “out” side of the solenoid valve. Connect
the 1/4" O.D. tubing (from the demineralizer) to this
fitting.
3.
Cut the 1/4" O.D. tubing (from last step) at a con-
venient point and install the tee from the still
adapter kit (Catalog No. 440376).
4.
Connect a length of 1/4" O.D. tubing to the third
arm of the tee. Connect the 1/4" O.D. to 3/8" I.D.
adapter to the free end of this length of 1/4" O.D.
tubing. Connect the
5/16" I.D. tubing (from the condenser) to this
adapter.
5.
Locate boiler fill tube "L." Connect 7/16" I.D. vinyl
tubing from demineralizer output to end of boiler fill
tube. Route as shown and install clip "S" to sup-
port the tubing.
F
EEDWATER
C
ONNECTIONS
Figure 8 Deionizer Feed
Note
If using the optional flowmeter,
install it at this point instead of the
adapter.
Summary of Contents for Mega-Pure Series 798
Page 26: ...26 Exploded View ...
Page 27: ...27 Wiring Diagram ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 31: ...31 ...