4.
Plug the solenoid valve power cord (not shown)
into the receptacle on the bottom of the control box
"H." (See Figure 5.)
5.
Go to the Still Output Connections section to com-
plete your still's setup.
Pretreated Boiler Feed
When a supply of distilled, deionized or reverse osmosis
water is to be used as boiler feed, first revise the still connec-
tions as follows:
1.
Remove boiler fill tube "O" from still and set aside.
2.
Locate the 3/8" I.D. x 44" long vinyl tubing and one
barbed tee (3/8" I.D. x 3/8" I.D. x 3/8" I.D.) in the
parts box.
3.
Install one end of the vinyl tubing to the cooling
water outlet located on the top right of the con-
denser "B" (where boiler fill tube "O" was
attached). Route the other end through the cabinet
and down the back as shown in Figure 7.
4.
Cut the 3/8" I.D. vinyl drain tubing and install the
barbed tee. Connect the 3/8" I.D. vinyl tubing from
condenser to the barbed tee. Push the vinyl tubing
all the way onto the tee to assure a leak free seal.
5.
Route the drain tubing to an atmospherically vent-
ed drain.
If you will be using a MEGA-PURE D1 or D2 demineralizer to
provide pretreated boiler feed, go to the Demineralizer
Treated Boiler Feed section. If you will be using an "in-house"
source of pretreated water for boiler feed, go to the In-House
Treated Boiler Feed section.
F
EEDWATER
C
ONNECTIONS
Figure 7 Tubing Connections
Summary of Contents for Mega-Pure Series 798
Page 26: ...26 Exploded View ...
Page 27: ...27 Wiring Diagram ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 31: ...31 ...