background image

A Crane Co. Company

BARNES

BARNES

®

INSTALLATION and OPERATION MANUAL

Break Away Fitting For Submersible Pumps

IMPORTANT! 

Read all instructions in this manual before operating pump.

 

As a result of Crane Pumps & Systems, Inc., constant product improvement program,

 

product changes may occur. As such Crane Pumps & Systems reserves the right to 

 

change product without prior written notifi cation.

420 Third Street   

 

83 West Drive, Bramton

Piqua, Ohio 45356 

 

Ontario, Canada L6T 2J6

Phone: (937) 778-8947 

 

Phone: (905) 457-6223

Fax: (937) 773-7157 

 

Fax: (905) 457-2650

www.cranepumps.com

Form No. 101701-Rev. F

Models: Without Check Valve

  BAFEZ-1.25 

2

  BAFEZ-2 

2

  BAFEZ-2 

3

  BAFEZ-3 

3

Models: With Check Valve

  BAFEZCV-1.25 

2

  BAFEZCV-2 

2

Manual Index

Summary of Contents for BAFEZ-1.25x2

Page 1: ...uct changes may occur As such Crane Pumps Systems reserves the right to change product without prior written notification 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario Canada L6T 2J6 Phone 937 778 8947 Phone 905 457 6223 Fax 937 773 7157 Fax 905 457 2650 www cranepumps com Form No 101701 Rev F Models Without Check Valve BAFEZ 1 25 x 2 BAFEZ 2 x 2 BAFEZ 2 x 3 BAFEZ 3 x 3 Models Wi...

Page 2: ... SAFETY FIRST 3 A SPECIFICATION 4 UPPER SUPPORT CHAIN 4 DIMENSIONS Figures 1 2 5 6 B GENERAL INFORMATION 7 C INSTALLATION 7 D MAINTANCE 7 E REPLACEMENT PARTS 8 EXPLODED VIEW PARTS LIST Figure 3 8 BAFEZCV s PARTS LIST INSTRUCTIONS Figure 4 9 BAFEZ 1 25x2 PARTS LIST INSTRUCTIONS Figure 5 10 BAFEZ 1 50x2 2x2 2x3 3x3 PARTS LIST INSTRUCTIONS Fig 6 11 INTERMEDIATE SUPPORTS Figures 7 8 12 RETURNED GOODS ...

Page 3: ...ings DO NOT insert fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operate pump without safety devices in place Always replace safety devices that have been removed during service or repair Secure the pump in its operating position so it can not tip over fall or slide DO NOT exceed...

Page 4: ...0 pipe should be used for guide rails An optional intermediate guide pipe bracket should be used for depths of 13 feet 4M or more The BAFEZ s can basically be used on any pump with the appropiate discharge size that does not exceed 200 lbs 91kg in weight which do not generate in excess of 150 ft Head 45 Meters The BAFEZ 3 is for pumps up to 200lbs which do not generate in excess of 150 ft of head ...

Page 5: ...Disch x Disch A B C D E F BAFEZCV 1 25x2 114035 1 25 X 2 3 27 83 3 31 84 4 69 119 7 40 188 12 07 307 4 33 110 BAFEZCV 2x2 114036 2 X 2 3 50 89 3 31 84 4 87 124 7 20 183 12 07 307 4 33 110 1 25 2 with Check Valve Recommend 3 to 5 per sec max ...

Page 6: ...030 1 25 x 2 2 87 73 3 31 84 4 75 121 7 52 191 12 07 307 4 33 110 BAFEZ 2x2 114031 2 x 2 3 20 81 3 31 84 5 32 135 6 75 171 12 07 307 4 33 110 BAFEZ 2x3 114032 2 x 3 3 20 81 4 68 119 5 32 135 10 27 261 15 59 396 6 50 165 BAFEZ 3x3 114033 3 x 3 3 97 101 4 68 119 5 64 143 9 95 253 15 59 396 6 50 165 FIGURE 2 ...

Page 7: ...ction with Barnes Submersible Sewage Pumps is recommended for operation in a non hazardous wet well tank or lift station WARNING UNIT NOT RECOMMENDED FOR OPERATION IN CLASS 1 GROUP D DIVISION 1 HAZARDOUS LOCATION WET WELL BASIN OR LIFT STATION C 2 Design Layout Figures 1 and 2 provide the required anchor bolt locations for the stationary elbow to be installed with four anchor bolts set in a metal ...

Page 8: ...lways furnish the following information 1 Product Model 2 Part Description 3 Part Number 4 Quantity Required 5 Shipping Instructions 6 Billing Instructions Product improvements are made from time to time The latest part design will be furnished as it is interchangeable with the old part FIGURE 3 ...

Page 9: ... Check Valve 1 from Sealing Plate 2 2 Thread Elbow Check Valve 1 into pump discharge 3 Bolt on Sealing Plate 2 4 Set lifting chain bail with one end on guide plate 3 and on pump lifting eye or lifting bail and balance for center of gravity 5 Attach lifting chain to clevis on lifting bail FIGURE 4 ...

Page 10: ...discharge of pump with sealing plate 2 and guide plate 3 attached 3 Tighten set screw to secure elbow with sealing plate and guide plate square 4 Set lifting chain bail with one end on guide plate 3 and on pump lifting eye or lifting bail and balance for center of gravity 5 Attach lifting chain to clevis on lifting bail FIGURE 5 ...

Page 11: ...n 1 Remove Elbow 1 from Sealing Plate 2 2 Thread Elbow 1 into pump discharge 3 Bolt on Sealing Plate 2 4 Set lifting chain bail with one end on guide plate 3 and on pump lifting eye or lifting bail and balance for center of gravity 5 Attach lifting chain to clevis on lifting bail FIGURE 6 ...

Page 12: ... intermediate guide rail support is required for every 13 feet 4m of guide rail Mount the intermediate between each section of guide rail pipe by inserting each pipe over the nipples of the intermedi ate Next secure the intermediate to the discharge piping Be sure to keep the guide rails from warping and keep them parallel and perpendicular FIGURE 7 FIGURE 8 ...

Page 13: ...formance specifications must be in writing and such writing must be signed by our authorized representative Due to inaccuracies in field testing if a conflict arises between the results of field testing conducted by or for user and laboratory tests corrected for field performance the latter shall control RECOMMENDATIONS FOR SPECIAL APPLICATIONS OR THOSE RESULTING FROM SYSTEMS ANALYSES AND EVALUATI...

Page 14: ...nt To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by the enclosed Warranty To complete the Warranty Registration Form go to http www cranepumps com ProductRegistration If you have a claim under the provision of the warranty contact your local Crane Pumps...

Reviews: