10
EN-IST-BBZO-0523
3
Technical data
3
Technical data
VALVE DATA
Maximum pressure
PN10
Maximum seal pressure
See catalogue
Storage temperature
from -10°C to 25°C
Material in contact with the product
AISI 316L (1.4404). Check the resistance to corrosion in relation to products and
detergents
Gasket material in contact with the product
EPDM, FKM, HNBR and other gaskets on request. Check compatibility with
products and detergents
Surface finish in contact with the product
Ra 0.8 µm. Other finishes available on request
VAPOUR BARRIER STRUCTURE DATA
Connectors
1/8” BSP
Steam maximum temperature
130°C (266°F)
Gaskets material
FKM
PNEUMATIC ACTUATOR DATA
Connectors
1/8” BSP
Pipe dimensions
6 mm external diameter, 4 mm internal diameter
Air pressure
from 6 bar (87 psi) to 8 bar (116 psi)
Air quality
Class 2, 4, 3 ISO8573-1
External material
AISI 304L (1.4307)
Seals
NBR
Noise levels
76 dB
Electrical supply
See Giotto Top
GASKET MATERIALS COMPATIBILITY
Product
EPDM
FKM
HNBR
MVQ
Temperature (applications with air)
from -10°C to +140°C
from -10°C to +200°C
from -10°C to +130°C
from -70°C to +230°C
Caustic soda 2%
60°C
30°C
To be checked
Unsuitable
Nitric Acid 2%
60°C
80°C
To be checked
Unsuitable
Saturated steam 125°C
Suitable
To be checked
Suitable
Unsuitable
Greases
Unsuitable
Suitable
Suitable
Unsuitable
Alcohols
Suitable
Unsuitable
Suitable
Suitable
The valve complies with PED 2014/68/EU directive, with special reference to
Annex III, Module A, concerning internal manufacturing checks as indicated in the
Conformity Assessment Procedures.
Valves with DN equal or smaller than DN25 are not included in compliance with Article 4,
paragraph 3.
Valves designed for use with gases, liquefied gases, gases dissolved under pressure, vapours
and also those liquids whose vapour pressure at the maximum allowable temperature is
greater than 0,5 bar above normal atmospheric pressure (1 013 mbar) are included within the
following limits:
- valves with DN between DN32 and DN100 (included) with group 1 fluids;
- valves with DN125 or bigger with group 2 fluids.
The end user must carry out noise assessment testing once the valve has been installed in the plant.
In the event of any doubt, please contact Bardiani Valvole S.p.A.
Summary of Contents for BBZO
Page 29: ...29 a b A S BBZOG B S BBZO EN IST BBZO 0523 10 Maintenance BBZO BBZOR BBZOG BBZOH...
Page 30: ...30 1 2 3 A S BBZOG 33 1 2 1 a1 a1 a1 EN IST BBZO 0523 10 Maintenance Normally closed...
Page 31: ...31 1 33 1 a2 EN IST BBZO 0523 10 Maintenance Normally open or double acting...
Page 32: ...32 BBYO BBYOG BBYOR 50 2 50 2 4 4 5 5 a d d a EN IST BBZO 0523 10 Maintenance...
Page 33: ...33 14 28 P T F E 2 14 2 6 7 a 6 a c 7 c S BBZOG 2 EN IST BBZO 0523 10 Maintenance...
Page 35: ...35 33 100 1 2 2 2 1 3 b2 b2 b2 EN IST BBZO 0523 10 Maintenance Normally open or double acting...
Page 36: ...36 6 5 b b 1 50 33 1 191 EN IST BBZO 0523 10 Maintenance...
Page 37: ...37 14 28 P T F E 2 14 2 7 b 7 c 8 c 2 8 b EN IST BBZO 0523 10 Maintenance...
Page 41: ...41 1 14 a b c EN IST BBZO 0523 10 Maintenance 10 6 Assembly of the BBZO BBZOG BBZOH BBZOR...
Page 42: ...42 277 276 17 9 274 275 10 6 9 19 7 7 1 1 2 2 3 a f f a a EN IST BBZO 0523 10 Maintenance...
Page 44: ...44 40 24 40 24 BBZO BBZOR BBZOG BBZOH 4 a 4 b EN IST BBZO 0523 10 Maintenance...
Page 46: ...46 OUT IN BBYO BBYOR 157 50 156 50 1 1 6 7 8 f f f EN IST BBZO 0523 10 Maintenance...
Page 49: ...49 50 2 17 17 a f 18 18 a f A M BBZOG 2 50 BBYO BBYOR EN IST BBZO 0523 10 Maintenance...
Page 50: ...50 19 33 2 1 2 20 21 1 a1 a1 a1 EN IST BBZO 0523 10 Maintenance Normally closed...
Page 51: ...51 19 1 2 1 2 a2 EN IST BBZO 0523 10 Maintenance Normally open or double acting...
Page 52: ...52 1 191 1 50 33 2 2 17 b 18 b B M BBZO EN IST BBZO 0523 10 Maintenance...
Page 54: ...54 2 19 20 b2 b2 EN IST BBZO 0523 10 Maintenance Normally open or double acting...
Page 55: ...55 33 100 2 1 2 21 b GIOTTO EN IST BBZO 0523 10 Maintenance...
Page 57: ...57 a b A S BBWOG1 B S BBWO1 EN IST BBZO 0523 10 Maintenance...
Page 58: ...58 1 33 1 2 4 5 6 a1 a1 a1 A S BBWOG1 EN IST BBZO 0523 10 Maintenance Normally closed...
Page 59: ...59 8 7 a a 50 EN IST BBZO 0523 10 Maintenance...
Page 60: ...60 1 33 4 5 a2 a2 EN IST BBZO 0523 10 Maintenance Normally open or double acting...
Page 61: ...61 6 a2 50 1 2 EN IST BBZO 0523 10 Maintenance...
Page 62: ...62 10 9 a a 23 238 128 2 2 2 14 11 a C S BBWO1 EN IST BBZO 0523 10 Maintenance...
Page 64: ...64 50 238 128 1 8 b1 9 10 11 b1 b1 b1 23 EN IST BBZO 0523 10 Maintenance...
Page 65: ...65 33 100 1 2 4 5 6 b2 b2 b2 33 EN IST BBZO 0523 10 Maintenance Normally open or double acting...
Page 66: ...66 7 8 9 2 50 23 238 128 1 EN IST BBZO 0523 10 Maintenance...
Page 67: ...67 14 2 11 12 13 286 120 50 1 191 10 EN IST BBZO 0523 10 Maintenance...
Page 69: ...69 1 14 a b c EN IST BBZO 0523 10 Maintenance 10 8 Assembly of the BBWO1 BBWOG1...
Page 70: ...70 277 276 17 9 274 275 10 1 2 3 EN IST BBZO 0523 10 Maintenance...
Page 73: ...73 a b A M BBWOG1 B M BBWO1 EN IST BBZO 0523 10 Maintenance...
Page 74: ...74 238 238 128 128 9 8 a a 10 a A M BBWOG1 23 238 128 2 50 EN IST BBZO 0523 10 Maintenance...
Page 75: ...75 a1 a1 11 12 286 EN IST BBZO 0523 10 Maintenance Normally closed...
Page 76: ...76 a1 a1 a1 13 1 14 15 2 33 1 2 EN IST BBZO 0523 10 Maintenance...
Page 78: ...78 a2 a2 33 2 15 14 1 13 a2 GIOTTO EN IST BBZO 0523 10 Maintenance...
Page 79: ...79 1 191 8 b 14 2 B M BBWO1 EN IST BBZO 0523 10 Maintenance...
Page 82: ...82 12 b1 33 100 1 2 2 EN IST BBZO 0523 10 Maintenance...
Page 84: ...84 2 12 13 14 b2 b2 b2 EN IST BBZO 0523 10 Maintenance...
Page 87: ...87 298 99 169 24 170 172 171 204 171 66 129 88 173 175 177 EN IST BBZO 0523 10 Maintenance...
Page 88: ...88 1 2 3 4 177 EN IST BBZO 0523 10 Maintenance 10 10 Disassembly of the BBZOT BBZOGT...
Page 89: ...89 5 6 7 8 175 173 88 129 EN IST BBZO 0523 10 Maintenance...
Page 90: ...90 9 10 11 12 13 171 66 204 66 172 171 66 EN IST BBZO 0523 10 Maintenance...
Page 91: ...91 14 15 16 17 24 99 170 170 169 99 298 CYL EN IST BBZO 0523 10 Maintenance...
Page 92: ...92 1 2 3 4 298 169 99 99 EN IST BBZO 0523 10 Maintenance 10 11 Assembly of the BBZOT BBZOGT...
Page 93: ...93 5 6 99 170 24 EN IST BBZO 0523 10 Maintenance...
Page 94: ...94 10 7 8 9 172 171 66 204 66 171 66 EN IST BBZO 0523 10 Maintenance...
Page 95: ...95 11 12 13 129 EN IST BBZO 0523 10 Maintenance...
Page 96: ...96 14 15 16 17 88 175 173 EN IST BBZO 0523 10 Maintenance...
Page 97: ...97 18 19 20 21 177 EN IST BBZO 0523 10 Maintenance...
Page 98: ...98 22 23 EN IST BBZO 0523 10 Maintenance...
Page 99: ...99 26 2 25 22 25 15 16 17 GIOTTO 18 EN IST BBZO 0523 10 Maintenance...
Page 101: ...101 BBZO EN IST BBZO 0523 12 2D diagram BBZO 12 2D diagram BBZO PTFE Execution...
Page 102: ...102 BBZO EN IST BBZO 0523 13 2D diagram BBYO 13 2D diagram BBYO...
Page 103: ...103 BBZO EN IST BBZO 0523 14 2D diagram BBZOG 14 2D diagram BBZOG PTFE Execution...
Page 104: ...104 BBZO EN IST BBZO 0523 15 2D diagram BBYOG 15 2D diagram BBYOG...
Page 105: ...105 BBZO EN IST BBZO 0523 16 2D diagram BBZOH 16 2D diagram BBZOH PTFE Execution...
Page 106: ...106 BBZO EN IST BBZO 0523 17 2D diagram BBZOR 17 2D diagram BBZOR PTFE Execution...
Page 107: ...107 BBWO1 EN IST BBZO 0523 18 2D diagram BBWO1 18 2D diagram BBWO1...
Page 108: ...108 BBWO1 EN IST BBZO 0523 19 2D diagram BBWOG1 19 2D diagram BBWOG1...
Page 109: ...109 BBZOT EN IST BBZO 0523 20 2D diagram BBZOT BBZOGT 20 2D diagram BBZOT BBZOGT...
Page 112: ...112 EN IST BBZO 0523 22 Recommendations NOTES...
Page 113: ...113 EN IST BBZO 0523 22 Recommendations NOTES...