background image

Manual

7960-369A

Date

11-01-05

Page

1 of 4

The following are the installation instructions for the Condensate Drain Box:

1. Four 3/16" holes must be drilled in the sleeve side for the drain mounting

screws.  (Refer to Figure 1.)

2. A 1/2" hole must be drilled in the sleeve side for the overflow tube.  (Refer to

Figure 1.)

3. Connect the drain line to the Wall Drain before mounting.

4. Place the drain box against the sleeve so the mounting holes line up.

5. Install the four mounting screws from the inside of the sleeve out.

6. Seal the inside of the sleeve where the overflow tube sticks through.  (Refer

to Figure 2.)

7. Remove the pipe plug from the rear drain of the Q/T

EC

 drain.

8. Install the plug in the side Q/T

EC

 drain.

9. Install the water trap in the rear Q/T

EC

 drain.  (Refer to Figure 3.)

10. Follow unit instructions for installation of the unit into the sleeve.

Bard Manufacturing Company
Bryan, Ohio  43506

Q/T

EC

CONDENSATE  DRAIN

SYSTEM

Copyright February, 1997

Reviews: