![Barco ZEUS Installation And Safety Manual Download Page 131](http://html.mh-extra.com/html/barco/zeus/zeus_installation-and-safety-manual_474408131.webp)
14. Preventative maintenance actions
14.2 3 month maintenance actions
MAINTENANCE TYPE B (perform every three months)
The 3 month maintenance actions, listed below, may be performed by a trained projectionist who is familiar
with potential hazards associated with the product.
No.
Maintenance action
Remarks
1
Clean the back/side air inlet vents of the Lamp Power Supply (LPS).
Use a vacuum cleaner.
2
Clean the housing of your projector.
Removal overall dust accumulation
on projector covers. See cleaning
instructions in this manual.
3
Verify the internal clock of the ICMP with real time clock. Correct if needed.
ICMP version 1.2.1 is required.
Communicator version 5.0 is required.
See user guide of Communicator for
detailed instructions.
R5905961 ZEUS 09/03/2015
127
Summary of Contents for ZEUS
Page 1: ...ZEUS Installation safety manual R5905961 00 09 03 2015 ...
Page 17: ...2 Safety PR Image 2 2 R5905961 ZEUS 09 03 2015 13 ...
Page 26: ...3 Getting started 22 R5905961 ZEUS 09 03 2015 ...
Page 44: ...6 Lenses Lens selection 40 R5905961 ZEUS 09 03 2015 ...
Page 84: ...10 Starting up 80 R5905961 ZEUS 09 03 2015 ...
Page 96: ...11 Scheimpflug 92 R5905961 ZEUS 09 03 2015 ...
Page 104: ...12 Convergence 100 R5905961 ZEUS 09 03 2015 ...
Page 128: ...13 Lamp House Lamp replacement 124 R5905961 ZEUS 09 03 2015 ...
Page 160: ...16 Removal and installation of the projector covers 156 R5905961 ZEUS 09 03 2015 ...
Page 176: ...18 Pin configurations 172 R5905961 ZEUS 09 03 2015 ...
Page 184: ...19 Environmental information 180 R5905961 ZEUS 09 03 2015 ...