R5912128 /03 SP4K-B
86
7.6 ICMP-X HDD status LEDs
ICMP-X HDD status LEDs
5
4
Image 7–9
4
HDD I/O LED
5
RAID LED
Status overview HDD I/Oand RAID LEDs:
HDD I/O
RAID
ICMP-X HDD Status
Off
Off
HDD idle / disk in RAID OK.
Blinking green
Off
HDD I/O activity / disk in RAID OK.
Blinking green
Slow blinking
red
HDD disks not (yet) initialized.
Blinking green
Fast blinking
red
HDD I/O activity / RAID rebuilding.
Off
Red
HDD idle / Disk error. Consult the following troubleshooting table for
curative actions.
When entering a new HDD in an ICMP-X, the HDD RAID LED will be full red for a short time. This is
not an error, the HDD has not yet been “recognized” by the projector and ICMP-X.
Once the HDD has been accepted by the ICMP-X, the full red LED will start blinking in accordance
with the previous status table.
If the LED remains full red, an error has occurred. In this case, consult the following troubleshooting
table for curative actions.
Troubleshooting
Situation
Solution
One disk failed (red LED) +
RAID degraded
.
The ongoing event is not interrupted.
Note:
The disk status (RAID degraded) can be
retrieved via the (Web) Commander. See user guide
of the (Web) Commander.
1. Switch off the power.
2. Replace the defect HDD with approved model of
the same storage capacity. See procedure
“Removing a HDD from the ICMP-X”, page 93
and
“Installing a HDD into the ICMP-X”, page 94
Ensure to insert the HDD firmly.
3. Switch on the power.
Result:
As soon the new HDD is detected by the
ICMP-X the rebuild of the RAID is started (Blinking
red LED).
One disk failed (red LED) + Error 10580 “
local
storage not available
”.
Note:
The disk status (Error code) can be retrieved
via the (Web) Commander. See user guide of the
(Web) Commander.
1. Switch off the power.
2. Replace the defect HDD with approved model of
the same storage capacity. See procedure
“Removing a HDD from the ICMP-X”, page 93
and
“Installing a HDD into the ICMP-X”, page 94
Ensure to insert the HDD firmly.
3. Switch on the power.
Summary of Contents for SP4K-B
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP4K B...
Page 4: ......
Page 8: ...R5912128 03 SP4K B 8...
Page 22: ...R5912128 03 SP4K B 22 Safety...
Page 54: ...R5912128 03 SP4K B 54 Physical installation projector...
Page 68: ...R5912128 03 SP4K B 68 Lenses and Lens holder...
Page 76: ...R5912128 03 SP4K B 76 ICMP X...
Page 96: ...R5912128 03 SP4K B 96 ICMP X...
Page 104: ...R5912128 03 SP4K B 104 Projector Power Cycle...
Page 110: ...R5912128 03 SP4K B 110 Connectivity...
Page 113: ...113 R5912128 03 SP4K B Image 10 3 Sealed top cover remove Convergence...
Page 115: ...115 R5912128 03 SP4K B 1 1 Image 10 6 Sealed cover fixation Convergence...
Page 140: ...R5912128 03 SP4K B 140 1 Image 12 17 Tightening the screws of the side cover Projector Covers...
Page 144: ...R5912128 03 SP4K B 144 Projector Covers...
Page 152: ...R5912128 03 SP4K B 152 List of tools...
Page 156: ...R5912128 03 SP4K B 156 Index...
Page 157: ......