11. Maintenance
11.5 Check cooling liquid level
What should be done ?
The projector is liquid cooled. It is important that the liquid level is checked at regular intervals. We advise to check every 3 months.
The liquid level must be between Min. and Max. Signi
fi
cant drop in liquid level indicates a major leakage and requires immediate
attention.
How to check
1. Remove the left side cover (Light Processor side). see "Removal of the side cover", page 139.
2. Check the liquid cooling level in the reservoir.
Max
Min
Image 11-5
Cooling liquid check
If the current liquid cooling level is somewhere between
Min
and
Max
, then no action should be taken.
If the current liquid cooling level is approaching the
Min
level point, than check for leakage in the cooling system prior starting
the re
fi
ll procedure.
If you cannot see the level, open the
fi
ller cap and shine a torch into the reservoir
154
R5905963 PROMETHEUS SERIES 09/03/2015
Summary of Contents for Prometheus I
Page 1: ...Prometheus series Installation safety manual R5905963 00 09 03 2015 ...
Page 15: ...1 Safety PR Image 1 2 R5905963 PROMETHEUS SERIES 09 03 2015 11 ...
Page 92: ...5 Lenses lens holder 88 R5905963 PROMETHEUS SERIES 09 03 2015 ...
Page 124: ...7 ICMP 120 R5905963 PROMETHEUS SERIES 09 03 2015 ...
Page 130: ...8 Communicator Touch Panel 126 R5905963 PROMETHEUS SERIES 09 03 2015 ...
Page 134: ...9 Starting up 130 R5905963 PROMETHEUS SERIES 09 03 2015 ...
Page 152: ...10 Removal and installation of the projector covers 148 R5905963 PROMETHEUS SERIES 09 03 2015 ...
Page 176: ...13 Specifications 172 R5905963 PROMETHEUS SERIES 09 03 2015 ...
Page 186: ...14 Pin configurations 182 R5905963 PROMETHEUS SERIES 09 03 2015 ...