5. Physical installation top cooler
5.3
Mounting the front support
Necessary tools
Allen key 3 mm
Necessary parts
•
Front support
•
5 screws (M4x8)
How to mount
1. Slide the front support bracket under the cooler frame so that holes in the upstanding plate matches the holes in the cooler
housing assembly.
Image 5-13
2. Drive in the 4 screws (M4) at the front.
3. Turn the assembly on its side, and drive in the
fi
xation screw (M4).
Image 5-14
5.4
Mount cooling frame on the projector
Necessary tools
•
Allen key 3 mm
•
Allen key 3.5 mm
R5906753 DPXK BLP SERIES 20/11/2017
45
Summary of Contents for DP2K-17BLP
Page 4: ......
Page 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...