PKT-GD/GS-IM-DE-B-EN-09-19 Rev.0
23
4. Transport and
storage
4.1 Scope of delivery
•
3/2-way automatic valve of PKT type
•
Possibly ordered accessories
4.1.1 Incoming goods inspection
The following items must be checked at the
time of delivery:
•
Does the number of delivered transport
containers correspond to the delivery
note?
•
Is the packaging free of visible damage?
•
Are the product and accessories free of
visible damages?
•
Are there any evidences of not gen-
tle handling during the transport (e.g.,
burns, scratches, colour)?
To have all the right for claim against the
transport company, you have to document
the possible external transport damages
(e.g. with photographs and a written proto-
col) before unpacking the product.
bar GmbH is not responsible for transport
damages and can take over no liability for
that.
4.2 Transport, packaging and
storage
DANGER
Suspended load!
When transporting, e.g. with a
crane, there is is a risk that parts
fall down and people are seriously injured.
•
Never exceed the permissible load of
the hoisting equipment used.
•
Use only suitable, approved and un-
damaged lifting slings for transport.
•
If you attach lifting slings to the rotary
actuator, they must be designed for
the entire actuator.
•
Connect the slings so that the prod-
ucts can not be damaged.
•
Exercise the utmost care when han-
dling and balancing the load.
•
Perform the works with constant eye
contact with the load.
•
Do not stay under or near the lifted
load.
•
Keep third persons out of the dan-
ger zone. Use appropriate barriers or
name supervisors.
Summary of Contents for agturn PKT Series
Page 1: ...3 2 way automatic valve of PKT type Translation of the original operating manual bar gmbh de...
Page 38: ...38 PKT GD GS IM DE B EN 09 19 Rev 0 12 EU Declaration of Incorporation...
Page 43: ...PKT GD GS IM DE B EN 09 19 Rev 0 43...
Page 49: ...49 Notes...
Page 50: ...50 Notes...
Page 51: ...51 Notes...