Figure 5.8: External Chemical Supply Terminal Block Detail
inserted and tightened.
•
Connect Hydraulic rams
•
Temporarily install Chute Up Switch to operated the chute
•
Apply electrical and air to machine
•
Operate the chute, using the maintenance switch to make sure the safety locks properly en-
gage freely
•
Use the pendant to lower the chute, CHUTE ENABLE and LOAD, ensure safety locks disen-
gage freely
•
Adjust safety locks until chute operates properly
•
When properly aligned remove Chute Up Switch and weld in place
•
Re-install Chute Up Switch
5.12.1
Chute Up Switch Installation
NOTE: Chute must me in the full up position
Install mounting bracket and adjust switch so that
half the length of the plunger is depressed. Refer to figure 5.10 on page 30.
5.13
Control Function Test
The machine should be cleaned after the installation is complete. A function test should then be
executed on the unloaded machine as follows:
28
Summary of Contents for SI Series
Page 1: ...Washer Extractor SI Series Installation and Operation Manual 9 Sep 2013 Revision 2 20 ...
Page 6: ...Figure 1 1 SI Product Family 2 ...
Page 14: ...Chapter 4 General Specifications 10 ...
Page 15: ...Figure 4 1 SI Series General Specifications 11 ...
Page 33: ...Figure 5 9 Loading Chute Installation 29 ...
Page 34: ...Figure 5 10 Loading Chute Up Switch Installation 30 ...