N°
000
29
36
38
0
A
B
C
D
E
TBML 80 MC
1 ÷ 1,5
20 ÷ 21
6 ÷ 7
3 ÷ 4
5 ÷ 6
TBML 120 MC
1 ÷ 1,5
20 ÷ 21
6 ÷ 7
3 ÷ 4
8 ÷ 9
TBML 160 MC
1 ÷ 1,5
20 ÷ 21
6 ÷ 7
3 ÷ 4
8 ÷ 9
TBML 200 MC
1 ÷ 1,5
20 ÷ 21
7 ÷ 8
3 ÷ 4
8 ÷ 9
1
2
3
N 0002937920
25 / 36
0006081544_201408
ENGLISH
ELECTRODE / IONISATION PROBE ADJUSTMENT DIAGRAM
1- Diffuser
2- Internal diffuser
3- Flame disk
4 - Ignition electrodes
5- Nozzles
6- Nozzle holder
After installing the nozzles, check the correct position of the electrodes and disk
according to the following measurements indicated in mm.
It’s advisable to check levels after every intervention on head.
RECOMMENDED NOZZLES: STEINEN type SS 45° (TBML 80 MC - 120 MC - 200MC)
MONARCH type HV 45° (TBML 160 MC)
SERVOMOTOR SQN72.6E5A20BT CAM REGULATION
1 Camshaft-motor coupling insertion
and exclusion pin.
2 Reference scale
3- Position indicator
Use the corresponding rings to modify the adjustment of the utilized cams
(
I - II - III
....). The ring pointer indicates the rotation angle set for each cam on
the respective reference scale.
I
Maximum air opening regulation cam (130°)
II
Total air closure (burner stopped)( 0°)
III
Air opening regulation cam for minimum gas (30°)
IV 1st diesel flame air regulation cam (50°)
V
Diesel 2nd flame valve activation cam (grater than cam IV) (80°)
FUEL/AIR REGULATION SERVOMOTOR
CAM REGULATION
Summary of Contents for TBML 80 MC
Page 2: ......
Page 35: ...33 36 0006081544_201408 ITALIANO SCHEMA ELETTRICO...
Page 36: ...34 36 0006081544_201408 ITALIANO...
Page 37: ...35 36 0006081544_201408 ITALIANO...
Page 71: ...33 36 0006081544_201408 ENGLISH WIRING DIAGRAM...
Page 72: ...34 36 0006081544_201408 ENGLISH...
Page 73: ...35 36 0006081544_201408 ENGLISH...
Page 75: ......