5.1 

Starting up the system

  DANGER

Uncontrolled system movement

When starting up, if the position measuring system is part 
of a closed loop system whose parameters have not yet 
been set, the system may perform uncontrolled 
movements. This could result in personal injury and 
equipment damage.

 

Persons must keep away from the system’s 
hazardous zones.

 

Startup must be performed only by trained technical 
personnel.

 

Observe the safety instructions of the equipment or 
system manufacturer.

1. 

Check connections for tightness and correct polarity. 

Replace damaged connections.

2. 

Turn on the system.

3. 

Check measured values and adjustable parameters 

(especially after replacing the BTL or electronics 

module).

5.2 

Operating notes

–  Check the function of the BTL and all associated 

components on a regular basis.

–  Take the BTL out of operation whenever there is a 

malfunction.

–  Secure the system against unauthorized use.

Startup

BTL7-A/E501-M_ _ _ _-J-DEXC-TA12

Magnetostrictive Linear Position Sensor – Rod Style

Type of protection “db” and “ta”

Flameproof enclosure

Summary of Contents for BTL7-A/E501-M Series

Page 1: ...eitung english User s guide fran ais Notice d utilisation italiano Manuale d uso espa ol Manual de instrucciones BTL7 A E501 M_ _ _ _ J DEXC TA12 II 1 2 GD Ex db IIC T6 T5 Ga Gb II 1 2 GD Ex ta IIIC T...

Page 2: ...www balluff com...

Page 3: ...II 1 2 GD Ex db IIC T6 T5 Ga Gb II 1 2 GD Ex ta IIIC T85 C T100 C Da IP68 BTL7 A E501 M_ _ _ _ J DEXC TA12 Betriebsanleitung deutsch...

Page 4: ...www balluff com...

Page 5: ...n Symbol X 8 2 5 4 Dokumente des Betreibers 8 2 6 Montage Installation und Einrichten 8 2 7 Wartung Pr fung und Reparatur 8 3 Aufbau und Funktion 9 3 1 Aufbau 9 3 2 Funktion 10 4 Einbau und Anschluss...

Page 6: ...mit der Einstellvorrichtung 21 9 Justieren mit der Einstellvorrichtung 22 10 R cksetzen aller Werte mit der Einstellvorrichtung Reset 25 11 Technische Daten 26 11 1 Genauigkeit 26 11 2 Umgebungsbedin...

Page 7: ...rspr che auftreten gelten die Angaben der Originalbetriebsanlei tung Sollte eine Betriebsanleitung in der Sprache des Verwen dungslandes fehlen darf das BTL nicht in Betrieb genom men werden Nehmen Si...

Page 8: ...leiben trotz korrektem Explosions schutz gewisse Restrisiken die Gefahren f r Personen und Anlagen hervorrufen k nnen 2 4 Zulassungen Normen und Konformit t Mit dem CE Zeichen best tigen wir dass unse...

Page 9: ...sstrecke bzw 1 Elektronikkopf eingesetzt werden Zone 0 ist ein Bereich in dem die gef hrliche explosionsf hige Atmosph re als Gemisch aus Luft und brennbaren Gasen oder D mpfen oder Nebeln st ndig ode...

Page 10: ...twortung des Betreibers und muss in einem Explosionsschutzdoku ment festgelegt werden Darin sind auch die Gef hrdungs analyse und beurteilung Schulungsnachweise Wartungs pl ne und weitere Unterlagen e...

Page 11: ...Nm festgedreht werden Die BTL besitzen am Stabende ein zus tzliches Gewinde zum Abst tzen bei gro en Nennl ngen Positionsgeber Definiert die zu messende Position auf dem Wellenleiter Positionsgeber si...

Page 12: ...n Position bestimmt werden soll Der Positionsgeber definiert die zu messende Position auf dem Wellenleiter Ein intern erzeugter INIT Impuls l st in Verbindung mit dem Magnetfeld des Positionsgebers ei...

Page 13: ...istanzring aus nichtmagnetisierbarem Material Positionsgeber Bild 4 3 Einbauvarianten in magnetisierbares Material 4 Einbau und Anschluss 4 2 2 Einbau vorbereiten Einbauvariante F r die Aufnahme des B...

Page 14: ...des Schwimmers empfehlen wir nichtmagnetisierbares Mate rial Ein St rmagnetfeld am Einschraubgewinde z B durch die Schwei naht am Gewindeflansch ist zu vermeiden Das BTL so einbauen dass nur der Stab...

Page 15: ...vollst ndig an der Aufnahmefl che anliegen Der passende O Ring muss die Bohrung perfekt abdichten d h die An senkung f r den O Ring muss Bild 4 4 entsprechend gefertigt werden Die Eignung des montier...

Page 16: ...und entfernen 3 Verbindungsanordnung f r den Wiederzusammenbau notieren und Anschlussverbindungen l sen 4 Die zwei Halteschrauben siehe Bild 4 6 des Elektro moduls entfernen 5 Elektronikmodul vorsich...

Page 17: ...rdungspotenzial liegen Hierf r ist ein ausreichender Potenzialausgleich erforderlich der nicht ber den Kabelschirm gef hrt werden darf Schirmung Zur Gew hrleistung der elektromagnetischen Vertr glich...

Page 18: ...hpersonal Sicherheitshinweise des Anlagen oder Systemher stellers beachten 1 Anschl sse auf festen Sitz und richtige Polung pr fen Besch digte Anschl sse tauschen 2 System einschalten 3 Messwerte und...

Page 19: ...e Bewegung vom Endpunkt zum Nullpunkt wird mit negativem Vorzeichen ausgegeben Max erfassbarer Geschwin digkeitsbereich von 10 bis 10 m s Geschwindigkeit kein Vorzeichen Geschwindig keit des Positions...

Page 20: ...se in einem potenziell explosionsgef hrdeten Bereich nicht ffnen Automatische Deaktivierung Werden die Taster der Einstellvorrichtung ca 10 min lang nicht bet tigt wird der Programmiermodus automatisc...

Page 21: ...eue Nullposition verschieben Neuen Nullpunkt durch Dr cken der Taster einlesen Der aktuelle Endpunkt bleibt erhalten Bild 7 1 Neuer Nullpunkt vorher nachher fallend steigend Neuen Nullpunkt einlesen P...

Page 22: ...g 1 auf Aus gang 2 umgeschaltet werden siehe Seite 24 Ablauf Positionsgeber in die neue Anfangsposition verschieben Neuen Anfangspunkt durch Dr cken der Taster einlesen Durch Dr cken der Taster den ge...

Page 23: ...t eingestellt 0 00 V 4 00 mA Endpunkt einstellen Positionsgeber an den neuen Endpunkt bringen 9 89 V 19 13 mA mindestens 2 s dr cken 2 s 2 Nach Loslassen ist der neue Endpunkt eingestellt 10 00 V 20 0...

Page 24: ...nkt ist mit zuletzt g ltigem Anfangswert eingestellt 0 00 V 4 00 mA Anfangswert justieren ber und kann der Anfangswert ver ndert werden1 Die Steigung der Kennlinie ndert sich siehe Seite 20 0 00 V 4 0...

Page 25: ...dert sich siehe Seite 20 10 00 V 20 00 mA 8 00 V 16 80 mA Einstellvorgang beenden und gleichzeitig kurz 1 s dr cken Eingestellter Positionswert wird gespeichert 1 s 1 2 8 00 V 16 80 mA Justieren beend...

Page 26: ...rte Beispiel bei 0 10 V bei 4 20 mA Ausgangslage BTL mit Positionsgeber im Messbereich 5 39 V 9 15 mA Justieren aktivieren mindestens 4 s dr cken 4 s 2 5 39 V 9 15 mA Umschalten des zu justierenden Au...

Page 27: ...eichs befinden Reset aktivieren und gleichzeitig mindestens 4 s dr cken 4 s 1 2 Taster Loslassen Reset ist aktiviert Reset und mindestens 4 s dr cken 4 s 1 2 Taster loslassen Alle Werte sind zur ckges...

Page 28: ...maufnahme bei 24 V DC BTL7 A501 150 mA BTL7 E501 180 mA Einschaltspitzenstrom 500 mA Verpolungssicher7 bis 36 V berspannungsschutz bis 36 V Spannungsfestigkeit GND gegen Geh use 500 V AC 11 4 Ausgang...

Page 29: ...ig ca 3 kg m Geh usematerial Edelstahl Flanschmaterial Edelstahl Stabmaterial Edelstahl Wandst rke Stab 2 mm Geh usebefestigung Flansch mit 6 Bohrungen 11 Technische Daten Fortsetzung BTL7 A E501 M_ _...

Page 30: ...g cm3 0 85 g cm3 Dichte des Schwim mers Eintauchtiefe Dichte 1 g cm3 H2 O Dichte 0 7 g cm3 41 mm 57 mm 26 mm 40 mm 30 mm 39 mm 45 mm taucht unter Einbaulage Zylindrischer Teil ist Oberseite des Schwim...

Page 31: ...l 12 3 USB Kommunikationsbox BTL7 A CB01 USB KA F r BTL7 A E501 mit Kabelanschluss Lieferumfang USB Kommunikationsbox USB Kabel 1 Adapterkabel ca 0 6 m Kurzanleitung 12 4 Einstellvorrichtung BTL7 A EH...

Page 32: ...tellig M0500 metrische Angabe in mm Nennl nge 500 mm M0025 M7620 Stabversion Befestigung J 6 Schrauben Lochkreis 76 2 mm Stopfen C Schwimmerstopfen Elektrischer Anschluss TA12 Klemme mit 1 2 14 NPT Ka...

Page 33: ...m inch 1 inch 25 4 mm inch mm 1 25 4 2 50 8 3 76 2 4 101 6 5 127 6 152 4 7 177 8 8 203 2 9 228 6 10 254 Tab 14 2 Umrechnungstabelle inch mm 14 Anhang 14 2 Typenschild 1 Bestellcode 2 Typ 3 Seriennumme...

Page 34: ......

Page 35: ...II 1 2 GD Ex db IIC T6 T5 Ga Gb II 1 2 GD Ex ta IIIC T85 C T100 C Da IP68 BTL7 A E501 M_ _ _ _ J DEXC TA12 User s Guide english...

Page 36: ...www balluff com...

Page 37: ...nts 8 2 6 Assembly installation and setup 8 2 7 Maintenance inspection repair 8 3 Construction and function 9 3 1 Construction 9 3 2 Function 10 4 Installation and connection 11 4 1 Minimum distance t...

Page 38: ...0 8 Teach in with the calibration device 21 9 Adjust with the calibration device 22 10 Reset all values with the calibration device reset 25 11 Technical data 26 11 1 Accuracy 26 11 2 Ambient conditio...

Page 39: ...he information in the original user s guide will apply if the contents of the translated versions are not clear or the information is contradictory Do not start up the BTL if you do not have a user s...

Page 40: ...nd systems when the device is correctly operated or if there are any fault states 2 4 Approvals standards and conformity The CE Mark verifies that our products meet the requirements of the current EMC...

Page 41: ...egory can be used in zone 0 measuring range or 1 electronics head Zone 0 refers to an area in which a hazardous explosive atmosphere made of a mixture of air and flammable gases vapors or mists is con...

Page 42: ...tor and must be documented in an explosion protection document This document must also contain the hazard analysis and assessment proof of training maintenance plans and other documents as required un...

Page 43: ...Nm The BTLs have an additional thread at the end of the rod to support larger nominal lengths Magnet Defines the position to be measured on the waveguide Magnets are available in various models and m...

Page 44: ...ined The magnet defines the position to be measured on the waveguide An internally generated INIT pulse interacts with the magnetic field of the magnet to generate a torsional wave in the waveguide wh...

Page 45: ...n magnetizable material Magnet Fig 4 3 Installation in magnetizable material 4 Installation and connection 4 2 2 Preparing for installation Installation note We recommend using non magnetizable materi...

Page 46: ...he BTL and float Avoid magnetic field interference at the screw in thread e g by the weld seam at the threaded flange Install the BTL in such a manner that only the rod extends into the explosive area...

Page 47: ...BTL must make full contact with the supporting surface A suitable O ring must completely seal the bore i e the countersink for the O ring must be produced according to Fig 4 4 Check the suitability of...

Page 48: ...move housing cover 3 Note wire locations for re assembly and disconnect wiring 4 Disconnect the two electronics module retaining screws see Fig 4 6 5 Carefully pull the electronics module out of the p...

Page 49: ...nd the control cabinet must be at the same ground potential A sufficient potential equalization is required that cannot be conducted over the cable shield Shielding To ensure electromagnetic compatibi...

Page 50: ...e the safety instructions of the equipment or system manufacturer 1 Check connections for tightness and correct polarity Replace damaged connections 2 Turn on the system 3 Check measured values and ad...

Page 51: ...he null point to the end point is output with a positive sign Movement from the end point to the null point is output with a negative sign Max detectable velocity range from 10 to 10 m s Velocity no s...

Page 52: ...ousing when an explosive atmosphere may be present Automatic deactivation If the buttons on the calibration device are not pressed for approx 10 min programming mode is automatically ended 1 Unscrew a...

Page 53: ...ove magnet to the new null position Read new null point by pressing the buttons The current end point remains the same Fig 7 1 New null point Before After Falling Rising Reading new null point Move ma...

Page 54: ...y The adjustment can be switched from output 1 to output 2 see page 24 Steps Move magnet to the new start position Read new start point by pressing the buttons Set the new start value by pressing the...

Page 55: ...is released 0 00 V 4 00 mA Set end point Bring magnet to the new end point 9 89 V 19 13 mA Hold down for at least 2 s 2 s 2 The new end point is set once the button is released 10 00 V 20 00 mA Inver...

Page 56: ...w start point is set with the last valid start value 0 00 V 4 00 mA Adjust start value The start value can be changed using and 1 The gradient of the curve changes see page 20 0 00 V 4 00 mA 2 00 V 7...

Page 57: ...changes see page 20 10 00 V 20 00 mA 8 00 V 16 80 mA End calibration procedure Briefly press and simultaneously 1 s Set position value is saved 1 s 1 2 8 00 V 16 80 mA End adjustment Briefly press an...

Page 58: ...example At 0 10 V At 4 20 mA Initial situation BTL with magnet in measuring range 5 39 V 9 15 mA Activate adjusting Hold down for at least 4 s 4 s 2 5 39 V 9 15 mA Switch the output to be adjusted Hol...

Page 59: ...te reset Hold down and simultaneously for at least 4 s 4 s 1 2 Release buttons Reset is activated Reset Hold down and for at least 4 s 4 s 1 2 Release buttons All values are reset Current position val...

Page 60: ...t draw at 24 V DC BTL7 A501 150 mA BTL7 E501 180 mA Inrush current 500 mA Reverse polarity protection7 Up to 36 V Overvoltage protection Up to 36 V Dielectric strength GND to housing 500 V AC 11 4 Out...

Page 61: ...rox 3 kg m Housing material Stainless steel Flange material Stainless steel Rod material Stainless steel Rod wall thickness 2 mm Housing mounting Flange with 6 holes 11 Technical data continued BTL7 A...

Page 62: ...7 g cm3 0 7 g cm3 0 85 g cm3 float density Immersion depth Density 1 g cm3 H2 O Density 0 7 g cm3 41 mm 57 mm 26 mm 40 mm 30 mm 39 mm 45 mm Immersed Installation position Cylindrical part is the top...

Page 63: ...ommunication box BTL7 A CB01 USB KA For BTL7 A E501 with cable connection Scope of delivery USB communication box USB cable 1 adapter cable approx 0 6 m condensed guide 12 4 Calibration device BTL7 A...

Page 64: ...500 Metric specification in mm nominal length 500 mm M0025 M7620 Rod version fastening J 6 screws hole circle 76 2 mm Plug C Float plug Electrical connection TA12 Terminal with 1 2 14 NPT conduit entr...

Page 65: ...nches 1 inch 25 4 mm inch mm 1 25 4 2 50 8 3 76 2 4 101 6 5 127 6 152 4 7 177 8 8 203 2 9 228 6 10 254 Tab 14 2 Conversion table inches to mm 14 Appendix 14 2 Part label 1 Order code 2 Type 3 Serial n...

Page 66: ......

Page 67: ...II 1 2 GD Ex db IIC T6 T5 Ga Gb II 1 2 GD Ex ta IIIC T85 C T100 C Da IP68 BTL7 A E501 M_ _ _ _ J DEXC TA12 Notice d utilisation fran ais...

Page 68: ...www balluff com...

Page 69: ...5 4 Documents de l exploitant 8 2 6 Montage installation et r glage 8 2 7 Maintenance inspection et r paration 8 3 Structure et fonctionnement 9 3 1 Structure 9 3 2 Fonctionnement 10 4 Montage et racc...

Page 70: ...u dispositif de r glage 21 9 Ajustage l aide du dispositif de r glage 22 10 R initialisation de l ensemble des valeurs Reset l aide du dispositif de r glage 25 11 Caract ristiques techniques 26 11 1 P...

Page 71: ...les traductions ne seraient pas claires ou pr senteraient des contradictions les donn es de la notice d utilisation originale pr vaudraient En cas d absence de la notice d utilisation dans la langue...

Page 72: ...des risques r siduels pouvant pr senter des dangers pour les personnes et les installations subsistent m me en cas de protection antid flagrante correcte 2 4 Homologations normes et conformit Avec le...

Page 73: ...mesure et 1 t te lectronique La zone 0 est un emplacement o une atmosph re explosive consistant en un m lange avec l air de substances inflammables sous forme de gaz de vapeur ou de brouillard est pr...

Page 74: ...et doit tre consign e dans un document relatif la protection contre les explosions Ce document doit contenir l analyse et l appr ciation des risques les justificatifs de formation les intervalles de...

Page 75: ...port pour les longueurs nominales importantes Capteur de position d finit la position mesurer sur le guide d ondes Les capteurs de position peuvent tre fournis sous diff rentes formes et doivent par c...

Page 76: ...l l ment de l installation dont la position doit tre d termin e Le capteur de position d finit la position mesurer sur le guide d ondes Une impulsion initiale g n r e en interne d clenche en combinai...

Page 77: ...u non magn tisable Capteur de position Fig 4 3 Variante de montage pour mat riau magn tisable 4 Montage et raccordement 4 2 2 Pr paration du montage Variante de montage pour la fixation du BTL et du c...

Page 78: ...isables Il convient d viter tout champ magn tique perturbateur au niveau du filetage visser par exemple en raison du cordon de soudure sur la bride filet e Monter le syst me BTL de telle sorte que seu...

Page 79: ...a surface de r ception Le joint torique ad quat doit parfaitement tanch ifier le per age cela signifie que le lamage du joint torique doit tre r alis de mani re conforme voir Fig 4 4 L aptitude du joi...

Page 80: ...rotection du bo tier 3 Noter l ordre des connexions pour le r assemblage et d brancher les connexions 4 Enlever les deux vis de fixation voir Fig 4 6 du module lectrique 5 Retirer avec pr caution le m...

Page 81: ...vant pas tre pass e par le c ble blind est n cessaire Blindage Pour garantir la compatibilit lectromagn tique CEM le syst me BTL et le syst me de commande doivent tre reli s avec un c ble blind Blinda...

Page 82: ...i Les consignes de s curit de l installation ou du fabricant doivent tre respect es 1 V rifier la fixation et la polarit des raccordements Remplacer les raccordements endommag s 2 Mettre le syst me en...

Page 83: ...itif Un mouvement du point d extr mit au point z ro est indiqu par un signe n gatif Plage de d tection de v locit max de 10 10 m s V locit sans signe v locit du capteur de position Il est impossible d...

Page 84: ...ans une zone potentiellement explosible D sactivation automatique Si les boutons du dispositif de r glage ne sont pas actionn s pendant env 10 minutes le mode programmation est quitt automatiquement 1...

Page 85: ...le nouveau point z ro Lire le nouveau point z ro en appuyant sur les boutons La fin de plage actuelle reste inchang e Fig 7 1 Nouveau point z ro Avant Apr s D croissante Croissante Lecture du nouveau...

Page 86: ...ie 2 voir page 24 Proc dure D placer le capteur de position sur la nouvelle position initiale Lire le nouveau point initial en appuyant sur les boutons En appuyant sur les boutons r gler la valeur ini...

Page 87: ...ro est r gl apr s rel chement du bouton 0 00 V 4 00 mA R glage de la fin de plage Amener le capteur de position sur la nouvelle fin de plage 9 89 V 19 13 mA Appuyer sur pendant au moins 2 s 2 s 2 La...

Page 88: ...au moins 2 s 2 s 1 Le nouveau point initial est r gl sur la derni re valeur initiale valable 0 00 V 4 00 mA Ajustage de la valeur initiale La valeur initiale peut tre modifi e au moyen de et 1 Le grad...

Page 89: ...nt de la courbe se modifie voir page 20 10 00 V 20 00 mA 8 00 V 16 80 mA Quitter la proc dure de r glage appuyer bri vement 1 s et en m me temps sur et La valeur de position r gl e est enregistr e 1 s...

Page 90: ...es exemple avec 0 10 V avec 4 20 mA Situation de d part BTL avec capteur de position dans la plage de mesure 5 39 V 9 15 mA Activation de l ajustage Appuyer sur pendant au moins 4 s 4 s 2 5 39 V 9 15...

Page 91: ...ialisation Appuyer en m me sur et pendant au moins 4 s 4 s 1 2 Rel cher les boutons La r initialisation est activ e R initialisation Reset Appuyer sur et pendant au moins 4 s 4 s 1 2 Rel cher les bout...

Page 92: ...7 E501 180 mA Courant de pointe au d marrage 500 mA Protection contre l inversion de polarit 7 Jusqu 36 V Protection contre la surtension Jusqu 36 V R sistance di lectrique GND par rapport au bo tier...

Page 93: ...ier Acier inoxydable Mat riau de la bride Acier inoxydable Mat riau de la tige Acier inoxydable Epaisseur de la paroi de la tige 2 mm Fixation du bo tier Bride avec 6 per ages 11 Caract ristiques tech...

Page 94: ...cm3 0 7 g cm3 0 85 g cm3 densit du flotteur Profondeur d immersion Densit 1 g cm3 H2 O Densit 0 7 g cm3 41 mm 57 mm 26 mm 40 mm 30 mm 39 mm 45 mm S immerge Position de montage La partie cylindrique r...

Page 95: ...munication USB BTL7 A CB01 USB KA Pour BTL7 A E501 avec c ble de raccordement Mat riel livr module de communication USB c ble USB 1 c ble d adaptation d env 0 6 m notice r sum e 12 4 Dispositif de r g...

Page 96: ...donn e m trique en mm longueur nominale 500 mm M0025 M7620 Mod le de tige fixation J 6 vis cercle de trous 76 2 mm Bouchon C bouchon de flotteur Raccordement lectrique TA12 borne avec 1 2 14 NPT passa...

Page 97: ...uce mm 1 25 4 2 50 8 3 76 2 4 101 6 5 127 6 152 4 7 177 8 8 203 2 9 228 6 10 254 Tab 14 2 Conversion pouce mm 14 Annexe 14 2 Plaque signal tique 1 Symbolisation commerciale 2 Type 3 Num ro de s rie 4...

Page 98: ......

Page 99: ...II 1 2 GD Ex db IIC T6 T5 Ga Gb II 1 2 GD Ex ta IIIC T85 C T100 C Da IP68 BTL7 A E501 M_ _ _ _ J DEXC TA12 Manuale d uso italiano...

Page 100: ...www balluff com...

Page 101: ...o e installazione 8 2 7 Manutenzione collaudo e riparazioni 8 3 Struttura e funzionamento 9 3 1 Struttura 9 3 2 Funzionamento 10 4 Montaggio e collegamento 11 4 1 Distanza minima da ostacoli fissi 11...

Page 102: ...di regolazione 21 9 Calibrazione con il dispositivo di regolazione 22 10 Ripristino di tutti i valori con il dispositivo di regolazione Reset 25 11 Dati tecnici 26 11 1 Precisione 26 11 2 Condizioni a...

Page 103: ...gessero contraddizioni valgono le indicazioni contenute nel manuale d uso originale In mancanza del manuale d uso nella lingua del paese di utilizzo il BTL non pu essere attivato In questo caso rivolg...

Page 104: ...osioni 2 4 Omologazioni norme e conformit Il marchio CE la conferma che i nostri prodotti sono conformi ai requisiti delle attuali Direttive EMC e ATEX Ulteriori informazioni su direttive omologazioni...

Page 105: ...ronica La zona 0 un area in cui presente sempre o frequentemente l atmosfera pericolosa a rischio di esplosione come miscela di aria e gas o vapori o nebbie infiammabili La zona 1 un area in cui duran...

Page 106: ...i protezione dalle esplosioni Questa documentazione deve contenere inoltre l analisi e la valutazione dei rischi i certificati di formazione i piani di manutenzione e ulteriori documenti in base ai re...

Page 107: ...orto in caso di grandi lunghezze nominali Datore di posizione definisce la posizione da misurare sulla guida d onda I datori di posizione sono disponibili in varie tipologie costruttive e devono esser...

Page 108: ...re determinata la posizione Il datore di posizione definisce la posizione da misurare sulla guida d onda Un impulso INIT generato internamente crea in unione con il campo magnetico del datore di posiz...

Page 109: ...tore di posizione Fig 4 3 Varianti di montaggio in materiale magnetizzabile 4 Montaggio e collegamento 4 2 2 Preparazione del montaggio Variante di montaggio per l installazione del BTL e del datore d...

Page 110: ...gnetizzabile Evitare un campo magnetico di disturbo sulla filettatura di avvitamento ad es attraverso il cordone di saldatura sulla flangia filettata Montare il BTL in modo che solo la barra sporga ne...

Page 111: ...lloggiamento L O ring idoneo deve sigillare perfettamente il foro cio la svasatura per l O ring deve essere eseguita come riportato in Fig 4 4 Verificare l adeguatezza dell O ring montato per l impieg...

Page 112: ...della custodia 3 Annotare la disposizione di collegamento per il riassemblaggio e allentare le connessioni 4 Rimuovere le due viti di fissaggio vedere Fig 4 6 del modulo elettronico 5 Estrarre con cau...

Page 113: ...A questo riguardo richiesto un bilanciamento di potenziale sufficiente che non deve essere condotto attraverso la schermatura del cavo Schermatura Per garantire la compatibilit elettromagnetica EMC B...

Page 114: ...avvertenze di sicurezza del produttore dell impianto o del sistema 1 Controllare che i collegamenti siano fissati saldamente e che la loro polarit sia corretta Sostituire i collegamenti danneggiati 2...

Page 115: ...Un movimento dal punto zero al punto finale viene emesso con un segno positivo Un movimento dal punto finale al punto zero viene emesso con un segno negativo Intervallo di velocit max rilevabile da 10...

Page 116: ...osione Disattivazione automatica Se i tasti del dispositivo di regolazione non vengono utilizzati per circa 10 min la modalit Programmazione viene terminata automaticamente 1 Allentare e rimuovere la...

Page 117: ...ne nella nuova posizione zero Rilevare il nuovo punto zero premendo i tasti L attuale punto finale rimane invariato Fig 7 1 Nuovo punto zero precedente successivo discendente ascendente Leggere il nuo...

Page 118: ...uscita 2 vedere pagina 24 Procedura Spostare il datore di posizione nella nuova posizione iniziale Rilevare il nuovo punto iniziale premendo i tasti Impostare il valore iniziale desiderato premendo i...

Page 119: ...zero 0 00 V 4 00 mA Regolazione del punto finale Portare il datore di posizione sul nuovo punto finale 9 89 V 19 13 mA premere per almeno 2 secondi 2 s 2 Dopo aver rilasciato il tasto viene impostato...

Page 120: ...vo punto iniziale sar impostato con l ultimo valore iniziale 0 00 V 4 00 mA Calibrazione del valore iniziale Tramite e possibile modificare il valore iniziale1 La pendenza della curva caratteristica s...

Page 121: ...fica vedere pagina 20 10 00 V 20 00 mA 8 00 V 16 80 mA Terminare il processo di regolazione premere e simultaneamente e brevemente 1 s Il valore di posizione impostato verr salvato 1 s 1 2 8 00 V 16 8...

Page 122: ...mA Situazione finale BTL con datore di posizione nel campo di misura 5 39 V 9 15 mA Attivazione della calibrazione premere per almeno 4 secondi 4 s 2 5 39 V 9 15 mA Cambiare l uscita di calibrazione p...

Page 123: ...ura Attivazione Reset premere simultaneamente e per almeno 4 secondi 4 s 1 2 Rilasciare il tasto Il reset attivato Reset premere e per almeno 4 secondi 4 s 1 2 Rilasciare il tasto Tutti i valori sono...

Page 124: ...s Corrente assorbita con 24 V DC BTL7 A501 150 mA BTL7 E501 180 mA Corrente massima di avviamento 500 mA Protezione inversione di polarit 7 fino a 36 V Protezione contro la sovratensione fino a 36 V R...

Page 125: ...g m Materiale corpo Acciaio inox Materiale flangia Acciaio inox Materiale barra Acciaio inox Spessore parete barra 2 mm Fissaggio del corpo Flangia con 6 fori 11 Dati tecnici continua BTL7 A E501 M_ _...

Page 126: ...0 7 g cm3 0 7 g cm3 0 85 g cm3 densit del galleggiante Pescaggio Densit 1 g cm3 H2 O Densit 0 7 g cm3 41 mm 57 mm 26 mm 40 mm 30 mm 39 mm 45 mm pesca Posizione di montaggio La parte cilindrica la par...

Page 127: ...BTL7 A CB01 USB KA Per BTL7 A E501 con collegamento via cavo Fornitura interfaccia di comunicazione USB cavo USB 1 cavo di adattamento di circa 0 6 m ciascuno istruzioni in breve 12 4 Dispositivo di r...

Page 128: ...ione metrica in mm lunghezza nominale 500 mm M0025 M7620 Versione a barra fissaggio J 6 viti circonferenza di giacitura fori 76 2 mm Tappo C tappo galleggiante Collegamento elettrico TA12 morsetto con...

Page 129: ...mm 1 25 4 2 50 8 3 76 2 4 101 6 5 127 6 152 4 7 177 8 8 203 2 9 228 6 10 254 Tab 14 2 Tabella di conversione pollici mm 14 Appendice 14 2 Targhetta di identificazione 1 Codice d ordine 2 Tipo 3 Numero...

Page 130: ......

Page 131: ...II 1 2 GD Ex db IIC T6 T5 Ga Gb II 1 2 GD Ex ta IIIC T85 C T100 C Da IP68 BTL7 A E501 M_ _ _ _ J DEXC TA12 Manual de instrucciones espa ol...

Page 132: ...www balluff com...

Page 133: ...ocumentos del explotador 8 2 6 Montaje instalaci n y configuraci n 8 2 7 Mantenimiento comprobaci n y reparaci n 8 3 Estructura y funcionamiento 9 3 1 Estructura 9 3 2 Funcionamiento 10 4 Montaje y co...

Page 134: ...zaje con el dispositivo de ajuste 21 9 Ajuste de valores con el dispositivo de ajuste 22 10 Reposici n de todos los valores con el dispositivo de ajuste reset 25 11 Datos t cnicos 26 11 1 Precisi n 26...

Page 135: ...arezcan contradicciones tendr n validez los datos de la versi n original Si no se dispone de un manual de instrucciones en el idioma del pa s de utilizaci n el BTL no deber ponerse en servicio En ese...

Page 136: ...protecci n contra explosi n 2 4 Homologaciones normas y conformidad Con el marcado CE confirmamos que nuestros productos cumplen con los requerimientos de las directivas CEM y ATEX actuales Encontrar...

Page 137: ...de medici n o 1 cabezal electr nico La zona 0 es un rea en la que siempre o con frecuencia existe una atm sfera peligrosa potencialmente explosiva formada por una mezcla de aire y gases vapores o nebl...

Page 138: ...ento de protecci n contra explosi n En l deben documentarse tambi n el an lisis y la evaluaci n de riesgos los certificados de formaci n los planes de mantenimiento y otros documentos de acuerdo con l...

Page 139: ...longitudes nominales Sensor de posici n define la posici n que se ha de medir en el gu aondas Los sensores de posici n est n disponibles en diferentes formas constructivas y se deben solicitar por sep...

Page 140: ...te sensor de posici n est unido con el componente de la instalaci n cuya posici n se desea determinar El sensor de posici n define la posici n que se ha de medir en el gu aondas Un impulso INIT genera...

Page 141: ...3 Variantes de montaje en material imantable 4 Montaje y conexi n 4 2 2 Preparaci n del montaje Variante de montaje para alojar el BTL y el sensor de posici n recomendamos un material no imantable Mo...

Page 142: ...agn tico de interferencia en la rosca p ej debido a la costura de soldadura de la brida roscada Se debe montar el BTL de tal modo que solo la varilla sobresalga por la zona con riesgo de explosi n 0 y...

Page 143: ...o La junta t rica adecuada debe hermetizar perfectamente el orificio por lo que el avellanado para la junta t rica debe efectuarse teniendo en cuenta Fig 4 4 Se debe verificar que la junta t rica mont...

Page 144: ...n de la conexi n para el nuevo montaje y soltar las uniones de conexi n 4 Retirar los dos tornillos de sujeci n v ase Fig 4 6 del m dulo electr nico 5 Sacar el m dulo electr nico con cuidado de la ca...

Page 145: ...ta compensaci n de potencial suficiente que no se puede tender por el blindaje del cable Blindaje El BTL y el control se deben conectar con un cable blindado a fin de garantizar la compatibilidad elec...

Page 146: ...ad del fabricante de la instalaci n o sistema 1 Compruebe que las conexiones est n asentadas firmemente y tengan la polaridad correcta Sustituya las conexiones da adas 2 Conecte el sistema 3 Compruebe...

Page 147: ...miento del punto final al punto cero sale con signo negativo Rango de velocidades m x detectable de 10 a 10 m s Velocidad no se al Velocidad del sensor de posici n El sentido de movimiento no se puede...

Page 148: ...aci n autom tica Si no se accionan los pulsadores del dispositivo de ajuste durante aprox 10 minutos el modo de programaci n finaliza autom ticamente 1 Soltar y retirar la cubierta de la carcasa 2 Des...

Page 149: ...osici n cero nueva Lea el punto cero nuevo accionando los pulsadores El punto final actual se conserva Fig 7 1 Nuevo punto cero antes despu s descendente ascendente Lectura del nuevo punto cero Despla...

Page 150: ...1 a la salida 2 v ase la p gina 24 Proceso Desplace el sensor de posici n a la nueva posici n inicial Lea el punto inicial nuevo accionando los pulsadores Ajuste el valor inicial deseado accionando lo...

Page 151: ...tado al soltar 0 00 V 4 00 mA Ajustar el punto final Lleve el sensor de posici n al nuevo punto final 9 89 V 19 13 mA Accione durante al menos 2 s 2 s 2 El punto final nuevo queda ajustado al soltar 1...

Page 152: ...uevo queda ajustado con el ltimo valor inicial v lido 0 00 V 4 00 mA Ajustar el valor inicial Con y se puede modificar el valor inicial1 Se modifica la pendiente de la curva caracter stica v ase la p...

Page 153: ...va caracter stica v ase la p gina 20 10 00 V 20 00 mA 8 00 V 16 80 mA Finalizar el proceso de ajuste pulse y al mismo tiempo brevemente 1 s Se guarda el valor de posici n ajustado 1 s 1 2 8 00 V 16 80...

Page 154: ...on 4 20 mA Posici n de salida BTL con sensor de posici n en la zona medible 5 39 V 9 15 mA Activar el ajuste Accione durante al menos 4 s 4 s 2 5 39 V 9 15 mA Conmutar la salida de ajuste Accione y du...

Page 155: ...l reset Active y al mismo tiempo durante al menos 4 s 4 s 1 2 Suelte los pulsadores El reset est activado Reset Accione y durante al menos 4 s 4 s 1 2 Suelte el pulsador Todos los valores se han repue...

Page 156: ...corriente con 24 V DC BTL7 A501 150 mA BTL7 E501 180 mA Corriente de pico 500 mA Protecci n contra polaridad7 Hasta 36 V Protecci n contra sobretensiones Hasta 36 V Resistencia a tensiones GND contra...

Page 157: ...cero inoxidable Material de la brida Acero inoxidable Material de la varilla Acero inoxidable Grosor de pared de la varilla 2 mm Fijaci n de la carcasa Brida con 6 orificios 11 Datos t cnicos continua...

Page 158: ...g cm3 espesor del flotador Profundidad de inmersi n Espesor 1 g cm3 H2 O Espesor 0 7 g cm3 41 mm 57 mm 26 mm 40 mm 30 mm 39 mm 45 mm se sumerge Posici n de montaje La zona cil ndrica es la parte super...

Page 159: ...i n USB BTL7 A CB01 USB KA Para BTL7 A E501 con conexi n de cable Volumen de suministro m dulo de comunicaci n USB cable USB 1 cable adaptador de aprox 0 6 m instrucciones breves 12 4 Dispositivo de a...

Page 160: ...ca en mm longitud nominal 500 mm M0025 M7620 Versi n de varilla fijaci n J 6 tornillos c rculo de orificios 76 2 mm Tap n C tap n de flotador Conexi n el ctrica TA12 borne con 1 2 14 NPT entrada de ca...

Page 161: ...25 4 2 50 8 3 76 2 4 101 6 5 127 6 152 4 7 177 8 8 203 2 9 228 6 10 254 Tab 14 2 Tabla de conversi n pulgadas mm 14 Anexo 14 2 Placa de caracter sticas 1 C digo de pedido 2 Tipo 3 N mero de serie 4 Se...

Page 162: ......

Page 163: ...II 1 2 GD Ex db IIC T6 T5 Ga Gb II 1 2 GD Ex ta IIIC T85 C T100 C Da IP68 BTL7 A E501 M_ _ _ _ J DEXC TA12...

Page 164: ...www balluff com...

Page 165: ...4 5 1 5 5 1 6 5 1 7 5 2 EX 6 2 1 6 2 2 6 2 3 6 2 4 6 2 5 7 2 5 1 7 2 5 2 IECEx 8 2 5 3 X 8 2 5 4 8 2 6 8 2 7 8 3 9 3 1 9 3 2 10 4 11 4 1 11 4 2 1 0 11 4 2 1 11 4 2 2 11 4 2 3 BTL 12 4 3 2 0 12 4 3 1 1...

Page 166: ...DEXC TA12 db ta 7 18 7 1 18 7 2 18 7 3 19 7 3 1 19 7 3 2 20 7 3 3 20 8 21 9 22 10 25 11 26 11 1 26 11 2 26 11 3 26 11 4 26 11 5 La Lb 26 11 6 27 12 28 12 1 28 12 2 29 12 3 USB 29 12 4 29 12 5 29 13 3...

Page 167: ...www balluff com 5 1 1 BTL BTL7 A E501 M_ _ _ _ J DEXC TA12 30 BTL 1 2 BTL 6 www balluff com 28 1 3 1 4 BTL Balluff 1 5 1 1 1 2 2 1 6 1 7 1 BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 168: ...ta IIIC T85 C T100 C Da IP68 Ta 50 C 70 C T85 50 80 C T100 BTL EN 60079 0 EN 60079 1 d EN 60079 26 EPL Ga EN 60079 31 t SIRA 11 ATEX 1104X CE BTL IECEx SIR 11 0048X www iecex com Class I Zone 1 A Ex d...

Page 169: ...com 7 EN 60079 14 EN 60079 17 EN 60079 19 d II 1G X 2 5 2 5 1 BTL II II 1 2 G 0 1 0 1 d IIC BTL 70 C 80 C T6 T5 BTL 85 C 85 C Ga Gb 1 2 G EPL t T85 C IIIC Da 1 D EPL 2 EX BTL7 A E501 M_ _ _ _ J DEXC...

Page 170: ...IECEx IECEx SIR 11 0048X BTL www iecex com Certified Equipment Scheme 2 5 3 X X 50 C 80 C O 14 2 2 5 4 1999 92 EC 2 EX 2 6 BTL 2 mm USB BTL BTL 2 7 BTL BTL BTL Balluff BTL7 A E501 M_ _ _ _ J DEXC TA1...

Page 171: ...6 96 1 59 5 77 10 2 18h6 A 25 4 5 6 7 88 5 76 2 60 3 1 BTL7 3 1 30 1 2 14 NPT FM 3615 3 3 3 D 1 BTL 6 M6 45 A4 70 3 1 3 5 Nm BTL 28 BTL 25 mm 7620 mm 3 2 1 A A 15 16 24 mm 1 2 14 NPT O M4x6 1 2 2 1 B...

Page 172: ...3 4 7 6 5 1 2 O O 3 1 12 1 2 12 2 3 1 2 14 NPT M20 12 5 4 1 2 14 NPT FM 3615 3 3 3 D 1 5 M6x45 A4 6 BTL7 A FK01 E J DEX 6 4 5 7 12 4 3 2 BTL INIT 2 2 USB 29 BTL 29 BTL7 A E501 M_ _ _ _ J DEXC TA12 db...

Page 173: ...www balluff com 11 4 1 BTL EN 60079 14 4 1 4 2 1 0 12 2 4 2 1 4 2 13 BTL 15 8 13 15 8 4 3 4 4 2 2 BTL 500 mm 13 mm BTL O O 4 4 4 4 O 15 4x2 1 O BTL BTL 28 BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 174: ...BTL BTL BTL O O 0 1 2 BTL 6 M6x45 A4 1 4 20 x 1 3 4 3 5 Nm 2 6 ft lb 3 14 4 33 40 Nm 25 30 ft lb ATEX 500 mm 4 3 2 0 12 1 4 3 1 BTL BTL 0 1 25 mm 4 4 4 3 2 0 12 1 1 12 1 2 BTL7 A E501 M_ _ _ _ J DEXC...

Page 175: ...www balluff com 13 4 BTL BTL 0 0 0 1 BTL 0 IP67 IEC EN60079 1 BTL O O 4 4 O 4 5 BTL 2 0 0 1 BTL 1 0 1 4301 Ss DIN 94 3 2 20 1 4301 BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 176: ...14 4 5 4 6 8 7 6 5 4 3 2 1 8 7 6 5 4 3 2 1 4 6 90 C 4 4 4 1 2 3 4 4 6 5 6 7 8 14 9 33 40 Nm 25 30 ft lb ATEX BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 177: ...3 PK 10 0 V3 2 20 4 mA3 2 4 BU GND4 5 BN 10 30 V 6 GN 0 10 V3 1 2 7 RD La 8 WH Lb 1 USB 17 6 1 2 GND 3 4 EMC GND 4 1 4 4 6 EN60079 14 BTL EMC BTL 85 BTL BTL EN 60079 0 NEC CEC 45 cm 18 BTL7 A 30 m1 B...

Page 178: ...16 5 1 1 2 3 BTL 5 2 BTL BTL 5 BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 179: ...cropulse Configuration Tool BTL7 A E USB BTL BTL www balluff com 6 2 USB La Lb GND USB 8 USB 0 6 m 6 1 6 3 USB BTL PC BTL BTL 10 10 m s 0 10 m s 4 mm 0 15 100 mm s 4 s 90 mm 65 mm BTL BTL BTL7 A E501...

Page 180: ...18 7 7 1 28 BTL BTL BTL BTL 1 2 10 1 2 3 BTL 7 10 4 5 33 40 Nm 25 30 ft lb ATEX 7 2 BTL 10 4 mm 10 BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 181: ...com 19 BTL 1 BTL7 A V 0 5 0 10 0 10 5 10 5 BTL7 E mA 3 6 4 0 20 0 20 4 3 6 2 BTL7 A V 10 5 10 0 0 0 5 0 5 BTL7 E mA 20 4 20 0 4 0 3 6 3 6 7 1 7 3 7 3 1 21 7 1 7 7 2 100 1 2 BTL7 A E501 M_ _ _ _ J DEXC...

Page 182: ...20 7 7 3 2 22 1 1 2 1 2 24 7 3 7 4 7 3 3 25 BTL BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 183: ...21 1 2 8 0 10 V 4 20 mA BTL 5 39 V 9 15 mA 4 s 4 s 1 5 39 V 9 15 mA 1 04 V 4 82 mA 2 s 2 s 1 0 00 V 4 00 mA 9 89 V 19 13 mA 2 s 2 s 2 10 00 V 20 00 mA 4 s 4 s 1 2 1 s 1 s 1 2 BTL7 A E501 M_ _ _ _ J D...

Page 184: ...1 2 9 0 10 V 4 20 mA BTL 5 39 V 9 15 mA 4 s 4 s 2 5 39 V 9 15 mA 1 04 V 4 82 mA 2 s 2 s 1 0 00 V 4 00 mA 1 20 0 00 V 4 00 mA 2 00 V 7 20 mA 1 s 1 s 1 2 2 00 V 7 20 mA 23 BTL7 A E501 M_ _ _ _ J DEXC T...

Page 185: ...balluff com 23 1 2 1 2 1 2 9 0 10 V 4 20 mA 9 89 V 19 13 mA 2 s 2 s 2 10 00 V 20 00 mA 1 20 10 00 V 20 00 mA 8 00 V 16 80 mA 1 s 1 s 1 2 8 00 V 16 80 mA 1 s 1 s 1 2 BTL7 A E501 M_ _ _ _ J DEXC TA12 db...

Page 186: ...24 9 1 2 1 2 0 10 V 4 20 mA BTL 5 39 V 9 15 mA 4 s 4 s 2 5 39 V 9 15 mA 4 s 4 s 1 2 22 1 2 BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 187: ...www balluff com 25 10 4 s 4 s 1 2 4 s 4 s 1 2 1 s 1 s 1 2 1 2 BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 188: ...418 40 C 80 C 50 C 80 C 50 C 85 C 90 600 bar EN 60068 2 274 5 100 g 6 ms 100 g 2 ms EN 60068 2 64 5 12 g 10 2000 Hz IEC 60529 IP66 IP684 6 11 3 10 30 V DC 0 5 Vss 24 V DC BTL7 A501 150 mA BTL7 E501 18...

Page 189: ...www balluff com 27 11 6 10 2 mm 25 7620 mm 3 kg m 2 mm 6 11 BTL7 A E501 M_ _ _ _ J DEXC TA12 db ta...

Page 190: ...47 BAM0148 69 g 34 g 34 g 52 g 15 bar 40 bar 20 bar 20 bar 20 C 120 C 0 6 g cm3 0 7 g cm3 0 7 g cm3 0 85 g cm3 1 g cm3 H2O 0 7 g cm3 41 mm 57 mm 26 mm 40 mm 30 mm 39 mm 45 mm 32 0 5 20 0 5 BTL2 S 4414...

Page 191: ...3 4R BTL P 1013 4S BTL P 1012 4R BAM013L BAM013P BAM013J 15 g 40 C 85 C 8 mm 12 3 USB BTL7 A CB01 USB KA BTL7 A E501 USB USB 1 0 6 m 12 4 BTL7 A EH03 60 25 4 45 5 BU GY 46 6 32 BAM02ME 96 g 12 5 BTL A...

Page 192: ...7 A 5 01 M0500 J DEXC TA12 A 0 10 V E 4 20 mA 5 10 30 V DC 01 2 01 2 4 M0500 mm 500 mm M0025 M7620 J 6 76 2 mm C TA12 1 2 14 NPT BTL7 A501 M0500 J DEXC SA_ _ _ TA12 13 BTL7 A E501 M_ _ _ _ J DEXC TA12...

Page 193: ...24 4 0 15748031 5 0 19685039 6 0 23622047 7 0 27559055 8 0 31496063 9 0 35433071 10 0 393700787 14 1 1 25 4 mm mm 1 25 4 2 50 8 3 76 2 4 101 6 5 127 6 152 4 7 177 8 8 203 2 9 228 6 10 254 14 2 14 14 2...

Page 194: ...hengshan Rd 8F Building A Yunding International Commercial Plaza 200125 Pudong Shanghai Phone 86 400 820 0016 Fax 86 400 920 2622 service cn balluff com cn DACH Service Center Germany Balluff GmbH Sch...

Reviews: