background image

User's Guide 

english

BTL6-V11V-M _ _ _ _ -A/B/Y/Z(8)-S115

Summary of Contents for BTL6-V11V-M Series

Page 1: ...User s Guide english BTL6 V11V M_ _ _ _ A B Y Z 8 S115...

Page 2: ...www balluff com...

Page 3: ...delines 7 4 2 Preparing for installation 7 4 3 Installing the transducer 8 4 3 1 Installation recommendation for hydraulic cylinders 8 4 4 Electrical connection 9 4 5 Shielding and cable routing 9 5 S...

Page 4: ...at our products meet the requirements of EU Directive 2004 108 EC EMC Directive The transducer meets the requirements of the following generic standards EN 61000 6 1 noise immunity EN 61000 6 2 noise...

Page 5: ...lations pertaining to the work to be done The operator is responsible for ensuring that local safety regulations are observed In particular the operator must take steps to ensure that a defect in the...

Page 6: ...Version D1 G A B Y Z 10 2 mm Thread M4x4 6 deep A8 B8 Y8 Z8 8 mm No thread 1 3 2 Function The BTL6 transducer contains the waveguide which is protected by an outer stainless steel tube rod A magnet is...

Page 7: ...4 1 Bore diameter if installed in a hydraulic cylinder 4 2 Preparing for installation Installation note We recommend using non magnetizable material to mount the transducer and magnet Horizontal assem...

Page 8: ...ar Dimensioning of the detailed solutions is the responsibility of the cylinder manufacturer The slide element material must be suitable for the appropriate load case medium used and application tempe...

Page 9: ...ame ground potential Shielding To ensure electromagnetic compatibility EMC observe the following Connect transducer and controller using a shielded cable Shielding Braided copper shield with minimum 8...

Page 10: ...e safety instructions of the equipment or system manufacturer 1 Check connections for tightness and correct polarity Replace damaged connections 2 Turn on the system 3 Check measured values and readju...

Page 11: ...t r w 1 Tab 6 1 Memory assignment 6 Device profile Description of status register Error This bit is set if the number of detected stops is less than the number of magnets entered in the Config registe...

Page 12: ...ble in the position result register see Memory address space mapping on page 11 The PLL_Sync_out time interval must be defined by the user during startup The position of the magnet can be calculated u...

Page 13: ...tection per IEC 60529 when attached IP 67 7 3 Supply voltage Voltage stabilized3 20 to 28 V DC Ripple 0 5 Vss Current draw at 24 V DC 75 mA Inrush current 4 A 0 5 ms Reverse polarity protection Up to...

Page 14: ...L P 1013 4R BTL P 1013 4S BTL P 1012 4R Spacer 8 mm material polyoxymethylene POM BTL5 P 4500 1 magnet solenoid Weight Approx 90 g Housing Plastic Operating temperature 40 C to 60 C BTL P 1028 15R spe...

Page 15: ...igurable M12 8 pin Fig 8 3 Connector BCC M488 0000 1A 000 43x834 000 BCC M478 0000 1A 000 43x834 000 Straight connector freely configurable M12 8 pin Fig 8 4 Connector BCC M478 0000 1A 000 43x834 000...

Page 16: ...thread M18x1 5 O ring rod diameter 10 2 mm B Metric mounting thread M18x1 5 O ring rod diameter 10 2 mm Y 3 4 16UNF thread O ring rod diameter 10 2 mm Z 3 4 16UNF thread O ring rod diameter 10 2 mm A8...

Page 17: ...5433071 10 0 393700787 Tab 10 1 Conversion table mm to inches 1 inch 25 4 mm inches mm 1 25 4 2 50 8 3 76 2 4 101 6 5 127 6 152 4 7 177 8 8 203 2 9 228 6 10 254 Tab 10 2 Conversion table inches to mm...

Page 18: ...Germany Balluff GmbH Schurwaldstrasse 9 73765 Neuhausen a d F Phone 49 7158 173 370 Fax 49 7158 173 691 service balluff de US Service Center USA Balluff Inc 8125 Holton Drive Florence KY 41042 Phone 8...

Reviews: