background image

64 | PV 210 

ݱҁ۴ӆ

-

Иކ

© 2005 Baker Hughes, a GE company – 

ґऊ۱߄ߓӯ澞

Summary of Contents for Druck PV 210

Page 1: ...rement com BHGE Data Classification Public Druck PV 210 Low Pressure Pneumatic Hand pump Instruction Manual English 1 8 Deutsch 9 16 Espa ol 17 24 Fran ais 25 32 Italiano 33 40 Portugu s 41 48 49 56 5...

Page 2: ......

Page 3: ...2005 Baker Hughes a GE company All rights reserved PV 210 Instruction Manual English i 1 1 2 3 4 6 5 7 8 PUSH FOR PRESSURE 4 5 2 8...

Page 4: ...ii PV 210 Instruction Manual English 2005 Baker Hughes a GE company All rights reserved...

Page 5: ...the user and the equipment from injury or damage Use suitably qualified technicians and good engineering practice for all procedures in this manual Pressure Do not apply pressure greater than the maxi...

Page 6: ...le manuel d utilisation Do not dispose of this product as household waste Use an approved organization that collects and or recycles waste electrical and electronic equipment For more information con...

Page 7: ...essure relief valve 2 1 Hose Adaptors Figure 1 To attach a hose 5 and adapter 6 to a connector 4 turn the knurled nut on the connector counterclockwise WARNING Before applying pressure make sure all c...

Page 8: ...to sensitive instruments To adjust the maximum output pressure turn the screw in the bottom of the pump handle 3 Operation 3 1 Calibration Comparison against an Analog Gauge 1 Connect a reference ins...

Page 9: ...ge the mode release the pressure 3 2 Operation with a High Resolution Pressure Calibrator Because the resolution is better it is possible you will see more of the small pressure changes identified in...

Page 10: ...g conditions 6 1 Safety Precautions You must inform GE if the product has been in contact with any hazardous or toxic substance The relevant COSHH or in the USA MSDS references and precautions to be t...

Page 11: ...2005 Baker Hughes a GE company All rights reserved PV 210 Instruction Manual English 7 6 2 Approved Service Agents For the list of service centers www gemeasurement com...

Page 12: ...8 PV 210 Instruction Manual English 2005 Baker Hughes a GE company All rights reserved...

Page 13: ...gen bzw Besch digungen Alle Verfahren in dieser Anleitung sind von entsprechend qualifizierten Technikern unter Beachtung bew hrter Methoden durchzuf hren Druck Beaufschlagen Sie das Ger t nicht mit D...

Page 14: ...den Geben Sie das Ger t bei einer zugelassenen Stelle ab die Elektro und Elektronik Altger te sammelt und oder wiederverwertet Wenden Sie sich wegen weiterer Informationen an Unsere Kundendienstabteil...

Page 15: ...duzierventil WARNUNG Vergewissern Sie sich dass alle Anschl sse korrekt sind und das Ger t von innen sauber und unbesch digt ist bevor Sie es mit Druck beaufschlagen Stellen Sie sicher dass alle Ger t...

Page 16: ...den Feineinsteller 2 im Uhrzeigersinn um den Druck zu erh hen oder drehen Sie ihn gegen den Uhrzeigersinn um den Druck zu verringern 2 4 Druck Vakuum W hlschalter Abbildung 1 Bevor Sie den Modus ndern...

Page 17: ...r drehen Sie es gegen den Uhrzeigersinn um den Druck zu verringern 6 Bet tigen Sie den Pumpengriff 7 bis der Druck in etwa korrekt ist 7 Um den Druck auf den exakten Wert einzustellen drehen Sie den F...

Page 18: ...gt sind die Adapter ausreichend festgezogen sind und das Druckreduzierventil 1 ausreichend festgezogen ist um dicht zu schlie en 2 Versuchen Sie nicht andere Verbindungen an der Pumpe festzuziehen Die...

Page 19: ...cherheitshinweise Sie m ssen GE informieren wenn das Produkt mit Gefahren oder Giftstoffen in Ber hrung gekommen ist Teilen Sie uns bitte auch die COSHH Referenzen oder in den USA die MSDS Referenzen...

Page 20: ...16 PV 210 Bedienungsanleitung Deutsch 2005 Baker Hughes a GE company Alle Rechte vorbehalten...

Page 21: ...a lesiones y da os Todos los procedimientos de este manual deben ser llevados a cabo por t cnicos convenientemente cualificados y con arreglo a las buenas pr cticas de ingenier a Presi n No aplique un...

Page 22: ...le residuos el ctricos y equipos electr nicos Para obtener m s informaci n puede ponerse en contacto con Nuestro departamento de atenci n al cliente www gemeasurement com Su oficina de la administraci...

Page 23: ...4 BSP o NPT 7 Manivela de la bomba 8 V lvula de seguridad ajustable ADVERTENCIA Antes de aplicar presi n compruebe que todas las conexiones sean correctas y que el interior del equipo est limpio y en...

Page 24: ...la 2 4 Selector de presi n vac o Figura 1 Antes de cambiar el modo aseg rate de que la v lvula de descarga de presi n 1 est abierta Para cambiar de modo utilice una herramienta adecuada y desplace el...

Page 25: ...do contrario para reducirla 6 Accione la manivela 7 hasta que la presi n sea casi correcta 7 Para ajustar la presi n al valor correcto gire el calibre de ajuste de precisi n 2 en el sentido de las agu...

Page 26: ...stada para garantizar la estanqueidad 2 No intente apretar otras conexiones de la bomba Vienen ajustadas de f brica y los cambios podr an da ar las juntas de estanqueidad 3 Durante las pruebas de fuga...

Page 27: ...que se debe realizar Condiciones de funcionamiento 6 1 Precauciones de seguridad Informe a GE si el producto ha estado en contacto con cualquier sustancia peligrosa o t xica INFORMACI N Los gases neum...

Page 28: ...os todos los derechos Las referencias COSHH control de sustancias peligrosas para la salud MSDS en EE UU y precauciones que se deben adoptar para su manipulaci n 6 2 Agentes de servicio t cnico autori...

Page 29: ...eur contre les risques de blessure et prot ger l appareil des dommages ventuels Faire appel des techniciens qualifi s et respecter les bonnes pratiques dans toutes les proc dures d crites dans ce manu...

Page 30: ...or recycles waste electrical and electronic equipment For more information contact one of these Our customer service department www gemeasurement com Your local government office Ne pas jeter ce prod...

Page 31: ...rpression r glable AVERTISSEMENT Avant d appliquer la pression v rifier les raccordements et la propret l int rieur de l appareil et s assurer que ce dernier n est pas endommag S assurer que l ensembl...

Page 32: ...montre pour la diminuer 2 4 S lecteur pression vide Figure 1 Avant de changer le mode v rifier que la soupape de surpression 1 est ouverte Pour changer le mode utiliser un outil adapt pour pousser le...

Page 33: ...e 7 jusqu ce que la pression soit presque correcte 7 Pour r gler la pression la valeur correcte tourner le vernier de r glage fin 2 dans le sens des aiguilles d une montre pour augmenter la pression o...

Page 34: ...surer l tanch it 2 Ne pas tenter de serrer d autres raccords sur la pompe Ces raccords sont r gl s en usine et toute modification risque d endommager les joints d tanch it 3 Pendant les tests d tanch...

Page 35: ...if d informer GE si le produit a t en contact avec une substance dangereuse ou toxique Pr ciser les r f rences COSHH ou FDS aux tats Unis ainsi que les pr cautions prendre pour sa manipulation INFORMA...

Page 36: ...32 Manuel d utilisation du PV 210 Fran ais 2005 Baker Hughes a GE company Tous droits r serv s 6 2 Centres de r paration agr s Pour obtenir la liste de nos centres de r paration www gemeasurement com...

Page 37: ...te a proteggere gli utenti e l attrezzatura da infortuni o danni Tutte le operazioni indicate in questa pubblicazione devono essere effettuate da tecnici adeguatamente specializzati e seguendo metodi...

Page 38: ...omestici Rivolgersi ad enti autorizzati alla raccolta e o al riciclaggio di apparecchiature elettriche ed elettroniche dismesse Per maggiori informazioni contattare Il reparto assistenza clienti GE ww...

Page 39: ...Valvola limitatrice di pressione regolabile AVVERTENZA Prima di applicare pressione assicurarsi che tutti i collegamenti siano corretti e che l apparecchio al suo interno sia pulito e non presenti da...

Page 40: ...il modo di funzionamento assicurarsi che la valvola di rilascio della pressione 1 sia aperta Per cambiare il modo usare uno strumento adeguato per spingere il selettore 3 verso il lato specificato sul...

Page 41: ...il verniero di regolazione fine 2 in senso orario per aumentare la pressione o in senso antiorario per diminuire la pressione Nota inizialmente possono verificarsi minime variazioni di pressione effet...

Page 42: ...ostituzione delle guarnizioni fare riferimento alle istruzioni del kit di assistenza Qualora per qualsiasi ragione si verifichi un guasto all interno della pompa si raccomanda di riportare l apparecch...

Page 43: ...ettagli relativi al difetto riparazioni da effettuare Condizioni di esercizio 6 1 Precauzioni di sicurezza Informare GE se il prodotto venuto a contatto con sostanze tossiche o pericolose Indicare gli...

Page 44: ...40 PV 210 Manuale D Uso Italiano 2005 Baker Hughes a GE company Tutti i diritti riservati...

Page 45: ...os para proteger o usu rio e o equipamento de ferimentos ou danos Use t cnicos qualificados adequados e boa pr tica de engenharia para todos os procedimentos neste manual Press o N o aplique press o m...

Page 46: ...a organiza o aprovada de coleta e ou reciclagem de res duos de equipamento eletr nico e el trico Para mais informa es entre em contato com Nosso departamento de atendimento ao cliente www gemeasuremen...

Page 47: ...f mea de 1 4 pol 7 Manivela da bomba 8 V lvula de al vio de press o ajust vel ADVERT NCIA Antes de aplicar press o verifique se todas as conex es est o corretas e se o equipamento est limpo e sem dano...

Page 48: ...4 Seletor de press o v cuo Figura 1 Antes de alterar o modo certifique se de que a v lvula de libera o de press o 1 esteja aberta Para mudar o modo use uma ferramenta aplic vel para empurrar o seleto...

Page 49: ...ideal 7 Para ajustar a press o no valor correto gire o n nio de ajuste fino 2 em sentido hor rio para aumentar a press o ou em sentido anti hor rio para diminu la Nota Inicialmente podem ocorrer pequ...

Page 50: ...i o Se por algum motivo ocorrer uma falha na bomba recomend vel que o equipamento seja devolvido para um agente indicado 5 Especifica es gerais 6 Procedimento para Produtos Devolvidos Se a unidade pre...

Page 51: ...alizado Condi es de opera o 6 1 Precau es de seguran a Voc deve informar a GE se o produto tiver entrado em contato com qualquer subst ncia perigosa ou t xica Indique as refer ncias relevantes ao COSH...

Page 52: ...48 Manual de Instru o do PV 210 Portugu s Brasil 2005 Baker Hughes a GE company Todos os direitos reservados...

Page 53: ...Baker Hughes a GE company 2005 PV 210 49 PV 210...

Page 54: ...50 PV 210 Baker Hughes a GE company 2005 www gemeasurement com C BSP COSHH F ft lb inH2O inHg lb MSDS NPT psi...

Page 55: ...Baker Hughes a GE company 2005 PV 210 51 1 PV 210 2 BSP 1 1 2 3 4 5 1 3 3 x 3 1 8 2 6 1 4 BSP NPT 7 8 NPT PV 210...

Page 56: ...52 PV 210 Baker Hughes a GE company 2005 2 1 1 5 6 4 2 2 1 1 2 3 1 2 2 4 1 1 3 2 5 2 8 3 2 PV 210...

Page 57: ...Baker Hughes a GE company 2005 PV 210 53 3 1 1 5 6 4 2 4 15 11 3 2 4 1 5 8 6 7 7 2 8 1 9 3 2...

Page 58: ...54 PV 210 Baker Hughes a GE company 2005 3 2 7 1 0 1 H2O 4 1 1 2 3 3 4 PV 210 5 5 0 3 0 45 0 0 9 a a 0 27 a a 1 14 5 50 20 H2O x x 150 x 46 x 46 6 7 x 1 8 x 1 8 0 6 1 3...

Page 59: ...Baker Hughes a GE company 2005 PV 210 55 6 GE www gemeasurement com RMA RGA RMA PV 210 6 1 GE 6 2 www gemeasurement com...

Page 60: ...56 PV 210 Baker Hughes a GE company 2005...

Page 61: ...2005 Baker Hughes a GE company PV 210 57 PV 210...

Page 62: ...58 PV 210 2005 Baker Hughes a GE company 1 PV 210 www gemeasurement com C BSP COSHH F ft lb inH2O inHg lb kg m mm MSDS NPT psi PTFE...

Page 63: ...2005 Baker Hughes a GE company PV 210 59 2 BSP o 1 1 2 3 4 5 1 m 3 3 ft x 3 mm 1 8 x2 6 1 4 BSP NPT 7 8 2 1 1 5 6 4 2 2 1 1 PTFE NPT PV 210 PV 210...

Page 64: ...60 PV 210 2005 Baker Hughes a GE company 2 3 1 2 2 4 1 1 3 2 5 2 8 3 3 1 1 5 6 4 2 4 15 Nm 11 ft lb 3 2 4 1 5 8 6 7 2 PV 210...

Page 65: ...2005 Baker Hughes a GE company PV 210 61 7 2 8 1 9 3 3 2 7 1 mbar 0 1 inH2O 4 1 1 2 3 3 4 PV 210 5 2...

Page 66: ...ker Hughes a GE company 5 6 GE www gemeasurement com RMA RGA RMA PV 210 6 1 GE COSHH MSDS 0 3 bar 0 45 psi 0 0 9 bara 0 27 inHg a a 1 bar 14 5 psi 50 mbar 20 inH2O x x 150 mm 6 7 x 46 mm 1 8 x 46 mm 1...

Page 67: ...2005 Baker Hughes a GE company PV 210 63 6 2 www gemeasurement com...

Page 68: ...64 PV 210 2005 Baker Hughes a GE company...

Page 69: ...2005 Baker Hughes a GE company PV 210 65 PV 210...

Page 70: ...66 PV 210 2005 Baker Hughes a GE company www gemeasurement com C BSP BSP COSHH F ft lb inH2O inHg lb kg m mm MSDS NPT psi 1 PTFE...

Page 71: ...2005 Baker Hughes a GE company PV 210 67 1 PV 210 2 BSP O 1 1 2 3 4 5 1 m 3 3 ft x 3 mm 1 8 x2 6 1 4 BSP NPT 7 8 2 1 1 5 6 4 PTFE NPT PV 210...

Page 72: ...68 PV 210 2005 Baker Hughes a GE company 2 2 1 1 2 3 1 2 2 4 1 1 3 2 5 2 8 3 3 1 1 5 6 4 2 4 15 Nm 11 ft lb 3 2 4 6 2 PV 210...

Page 73: ...2005 Baker Hughes a GE company PV 210 69 4 1 5 8 6 7 7 2 8 1 9 3 3 2 7 1 mbar 0 1 inH2O 4 1 1 2 3 3 4 PV 210 5 2...

Page 74: ...0 2005 Baker Hughes a GE company 5 6 GE www gemeasurement com RMA RGA RMA PV 210 0 3 bar 0 45 psi 0 0 9 bara 0 27 inHg a a 1 bar 14 5 psi 50 mbar 20 inH2O x x 150 mm 6 7 x 46 mm 1 8 x 46 mm 1 8 0 6 kg...

Page 75: ...2005 Baker Hughes a GE company PV 210 71 6 1 COSHH MSDS 6 2 www gemeasurement com...

Page 76: ...72 PV 210 2005 Baker Hughes a GE company...

Page 77: ......

Page 78: ...ia bhge com Milan Phone 39 02 36 04 28 42 Email mariangela scarati bhge com Chuo ku Tel 03 6890 4538 Email gesensing japan bhge com Netherlands Russia UK Hoevelaken Phone 31 334678950 Email NL sensing...

Reviews: