background image

OPERATING MANUAL 

Air heater Type XS, S, M, L, XL, PN10

 

          

 

 

 

SAFETY 

 

 

Danger  to  life

 

when  opening  the  air  heater,  as  live  components  and  connections  are 

exposed.  The  device  must  be 

fully

 

disconnected  from  the mains  before  opening.  Electric 

work shall only be operated by qualified personal (according to TRBS 1203). 

 

 

 

Risk of fire and explosion

 

if air heaters are installed and used incorrectly, particularly 

near flammable materials and explosive gases. 

Not suitable for hazardous locations! 

The minimal air flow must not be undercut. 

 

 

 

Risk of burns!  

Do not touch heating element pipes and nozzles used when hot. Let the 

device cool down. Do not point the hot air jet at persons or animals.

 

 

 

 

 

The mains voltage

 

specified on the device's type plate must correspond to the mains 

voltage. Air heaters with a fix connection must be connected to a separator ( e.g. mains 
switch). 
Special connecting conditions          Z

max 

= 0.039

 + j 0.025

 for short time rating (30 min.) 

according to IEC/EN 61000-3-11;    Z

max 

= 0.026

 + j 0.016

 for continuous operation 

Consult your local electricity board if necessary. 

 

 

 

Device in protection class I

 should be earthed using a protective conductor 

 

 

 

Device in protection class II 

 

 

 

The device must be supervised

 

when in operation. The heat can reach flammable 

materials that are out of view. 

 

 

 

Protect the device from damp and wet! 

 
 

WARRANTY AND LIABILITY 

Warranty  and  liability  apply  from  the  date  of  purchase  (documented  by  the  invoice/delivery  note) 
according to the currently valid general terms of business of

 

BAK

 A

G

.

 

BAK

 

refuses any warranty for devices that are not in their original condition.

 

No  liability can  be  assumed  by

 

BAK

 

for  incorrect  installation  and/or  use  as  well  as  natural  wear  and 

tear of the device (e.g. heating elements).

 

BAK

 – 

devices may never be converted and/or modified.

 

BAK

 

reserves the right to deny any responsibility if this is ignored.

 

 

Note: 

This operating manual must be available to the installing and operating personnel at all times. Please 
read this operating manual carefully before installing and commissioning the device. 

 

Copyright:  

This document maybe disclosed to third parties without the express written consent of 

BAK

 AG. 

Any 

type 

of 

copying 

or 

recording 

and 

storage 

in 

an 

electronic 

form 

is 

prohibited.

Summary of Contents for XS20-450TC

Page 1: ...ult your local electricity board if necessary Device in protection class I should be earthed using a protective conductor Device in protection class II The device must be supervised when in operation...

Page 2: ...Y 2 1 To protect the device and heating element the minimum air volume must flow Never exceed the max temperature Measured at the hottest point 3mm from the air outlet The heater must be switched off...

Page 3: ...xperts will be pleased to help you with your problems ACCESSORIES Get the best results by using BAK accessories and spare parts Further information can be found in our brochures SERVICE AND REPAIRS Re...

Page 4: ...h 1 2 Blow off opening female inch 1 2 Dimensions L x W x H mm 360x160 442 5 x 285 575 x 340 Conformity symbol Protection class I Type S Technical data Air heater Type S21 Type S32 Type S36 Voltage VA...

Page 5: ...80 Frequency Hz 50 60 Power kW 5 9 7 1 8 5 7 6 9 2 10 9 11 8 14 3 17 1 17 4 21 0 25 0 Electricity A 8 5 9 4 10 2 10 9 12 0 13 2 17 1 18 7 20 5 25 1 27 6 30 1 Max temperature C F 650 1202 Min air volum...

Page 6: ...C L1 black L2 brown L3 blue Protective conductor yellow green Type S 1 Screwed cable gland mains connection 2 Potentiometer 0 8 control cable with external control PWM 10 24VDC max cycle time 1 second...

Page 7: ...tion 2 Screwed cable gland control cable with external control 3 Potentiometer 0 9 no potentiometer in devices without electronics and external control 4 Mounting on underside of housing M 8 useful th...

Page 8: ...ange over contact at the clamps 1 3 see connection diagram A restart of the power stack is only possible after a reset disconnection of the tool from the mains power Measures when activating the heati...

Reviews: