![Bailey STT03E Product Instruction Download Page 25](http://html1.mh-extra.com/html/bailey/stt03e/stt03e_product-instruction_467167025.webp)
OPERATING PROCEDURES
INITIAL START-UP
4 - 4
WBPEEEUI110501A0
INITIAL START-UP
The sequence of screens described will appear when the STT03E terminal is
powered up for the first time and is not connected to a field device, or when
a configuration is created and stored in the terminal.
NOTE:
The terminal (if not configuring or calibrating) will automatically
shut itself off after approximately 15 minutes without operator interaction.
Operational
1
Monitor field device output (%)
Monitor field device input (engineering units)
Monitor field device temperature
Monitor secondary units output
Fix field device output value
Status check
LCD set up
Standard configuration
Copying configurations to and from STC cartridges
NOTE:
1. These functions apply to all field devices covered in this section. The procedures for each
transmitter type are covered in the appendices at the back of this instruction.
Table 4-3. STT03E Scroll Characters
1
A
G
M
S
Y
B
H
N
T
Z
C
I
O
U
-
D
J
P
V
%
E
K
Q
W
/
F
L
R
X
#
NOTE
:
1. Holding the up or down arrow key allows the user to quickly scroll through the available
characters.
Table 4-2. STT03E Function Groupings
Function
Procedure
Key
Display
Comments
ON
BAILEY F&P
STT03E
REVISION E11