TRANSPORTING AND LIFTING
Follow these guidelines when lifting with truck or trolley:
•
The lift truck must be able to lift at least 1.5
– 2
times the machines gross weight.
•
Make sure the machine is balanced. While
transporting, avoid rough or jerky motion, and
maintain a safe clearance zone around the
transport area.
•
Use a forklift with sufficient lifting capacity and
forks that are long enough to reach the complete
width of the machine.
•
Remove the securing bolts that attach the
machine to the pallet.
•
Approaching the machine from the side, lift the machine on the frame taking care that there
are no cables or pipes in the area of the forks.
•
Move the machine to the required position and lower gently to the floor.
•
Level the machine so that all the supporting feet are taking the weight of the machine and no
rocking is taking place.
Follow these guidelines when lifting crane or hoist:
•
Use lift equipment such as straps, chains, capable of lifting 1.5 to 2 times the weight of the
machine.
•
Take proper precautions for handling and lifting.
•
Check if the load is properly balanced by lifting it an inch or two.
•
Lift the machine, avoiding sudden accelerations or quick changes of direction.
•
Locate the machine where it is to be installed, then lower slowly until it touches the floor.
NOTICE: Lifting and carrying operations should be carried out by skilled workers, such as a
truck operator, crane operator, etc. If a crane is used to lift the machine, attach the lifting
chain carefully, making sure the machine is well balanced.
Summary of Contents for RDB-480
Page 17: ...14 14 GETTING TO KNOW YOUR MACHINE D F G I K N L M A B C E H J...
Page 42: ...39 39 ELECTRICAL SCHEMATIC...
Page 46: ...43 43 Diagram 1...
Page 47: ...44 44 Diagram 2...
Page 48: ...45 45 PARTS DIAGRAM Cabinet Assembly...
Page 49: ...46 46 Electrical Panel...
Page 50: ...47 47 Controller and Arm Assembly...