
24
24
Headstock Spur Center
The headstock spindle has an MT#2 taper hole into which the
spur center fits.
1. Turn off and unplug the lathe from the power source.
2. Make sure the shank of the spur center (A) and the spindle
hole are clean and free of debris
3. Using hand force only, fit the spur center firmly in the spindle
hole.
4. To remove the headstock spur center, knock it out from the
opposite end of the spindle using the supplied knock-out-bar
(B).
Note:
When knocking out the spur
center, always hold it by hand to prevent it from
falling.
Tailstock Live Center
The tailstock has an MT#2 taper hole into which
the live center fits.
1. Turn off and unplug the lathe from the power source.
2. Make sure the shank of the live center (A) and
the tailstock hole are clean and free of debris
3. Using hand force only, fit the live center firmly
in the spindle hole.
4. To remove the live center (A) from the tailstock
quill, fully retract the quill into the tailstock.
5. To do this, loosen the tailstock quill locking
lever (B) and turn the quill movement
handwheel (C) counterclockwise until the quill
end is nearly inside the tailstock and the live
center can be re-moved by hand.
Note:
When removing the live center, always hold it by hand to prevent it from
falling.
B
A
A
B
C
Summary of Contents for WL-1218VS
Page 41: ...38 38 WIRING DIAGRAM ...
Page 42: ...39 39 LATHE PARTS DIAGRAM ...
Page 49: ...46 46 NOTES ...
Page 50: ...47 47 NOTES ...
Page 51: ...48 48 NOTES ...