Items Not Included with the Table
•
Electrical plugs or connector for input power to the console and plasma cutter.
•
Clean, dry air/gas supply to the plasma cutter.
•
Computer to operate CAD-CAM software.
•
Other tools and equipment used to safely move and handle materials.
Y Axis Servo Drive Installation
The table is shipped with the servo drive motor and gear reducer assemblies removed to meet
shipping width requirements.
Once the table is placed in its location and leveled, the motor assemblies can be installed.
1. Position the gantry fully forward so that the
riser plates are contacting the stop blocks
evenly on both sides of the table (A, right
side shown).
2. Starting with the right side, (cable track
side) locate four of the socket head cap
screws, lock washers, and flat washers
supplied with the motors.
Note: Do not remove or adjust on
the two jack screws in the bottom of the pocket.
3. Holding the drive assembly at a slight angle
with the gear downward, insert the drive gear
through the hole and engage the pinion gear with
the gear rack.
4. Seat the mounting plate in the pocket and install
and tighten the four socket head cap screws, lock
washers and float washers (B, one shown).
5. Match and connect the four and six pin connectors
together.
6. Verify that the gantry riser has remained against
the stop block and repeat these steps for the left
side of the table.
IMPORTANT: It is important to verify that the gantry is in even contact with the
stop blocks during motor installation to maintain the squareness of the gantry.