13
13
Follow these guidelines when lifting crane or hoist:
Always lift and carry the machine with the
lifting holes provided at the top of the
machine.
Use lift equipment such as straps, chains,
capable of lifting 1.5 to 2 times the weight
of the machine.
Take proper precautions for handling and
lifting.
Check if the load is properly balanced by
lifting it an inch or two.
Lift the machine, avoiding sudden
accelerations or quick changes of
direction.
Locate the machine where it is to be
installed, and lower slowly until it touches
the floor.
INSTALLATION
IMPORTANT:
Consider the following when looking for a suitable location to place the machine:
Overall weight of the machine.
Weight of material being processed.
Sizes of material to be processed through the machine.
Space needed for auxiliary stands, work tables, or other machinery.
Clearance from walls and other obstacles.
Maintain an adequate working area around the machine for safety.
Have the work area well illuminated with proper lighting.
Keep the floor free of oil and make sure it is not slippery.
Remove scrap and waste materials regularly, and make sure the work area is free from
obstructing objects.
It is important to maintain free area around the machine, which is required for the working
place. If any long material is machined, it is necessary to have a sufficient room in front of
the machine as well behind it in the places of material input and output.
A
Summary of Contents for IP-2509-HD-3
Page 43: ...40 40 All measurements are shown below knife Adjustment Dimensions...
Page 61: ...58 58 ELECTRICAL SCHEMATIC...
Page 62: ...59 59 PARTS DIAGRAM...
Page 63: ...60 60...
Page 64: ...61 61...
Page 65: ...62 62...
Page 66: ...63 63...
Page 67: ...64 64...
Page 68: ...65 65...
Page 79: ...76 76 NOTES...