OPERATION
Controls
•
The main electrical box houses the majority of the
electronics which controls the machine.
•
To power machine, plug into a standard 220V wall
outlet.
•
Activate the power toggle switch to the “ON”
position. It takes approx. 20-30 seconds before the
motor drive is ready to run.
•
The control panel has a speed pot control and a
selector for FWD/STOP/REV direction. Forward will
feed material from right to left. Reverse will feed
material from left to right.
•
Select a direction of rotation.
•
The bottom roll will begin to rotate as the foot pedal
is depressed and will gradually increase rotational
speed until it reaches the maximum speed set on
the potentiometer.
Rolling
1. Unplug the power cord whenever changing dies.
2. To operate the machine, a set of tooling needs to be selected and installed. Either roller can
be on top or bottom depending on your application.
3. With a set of tooling installed, the tool gap can be set with the top hand wheel (A). Clockwise
(cw) is down, counterclockwise (ccw) is up.
CAUTION:
Always wear proper eye protection with side shields, safety
footwear, and leather gloves to protect from burrs and sharp edges.
CAUTION:
Keep hands and fingers clear of the rolling dies. Be aware of
how the material moves as it is being formed. Normally the operator should stand in
front of the bead roller to avoid getting hit with the material as it is being formed. When
handling large heavy materials make sure they are properly supported.
Summary of Contents for BR-16E-36LT
Page 23: ...21 21 FRAME ASSEMBLY...
Page 24: ...22 22 SHAFT HOUSING ASSEMBLY...
Page 25: ...23 23 LOWER SHAFT ASSEMBLY...
Page 26: ...24 24 CAM HOUSING ASSEMBLY...
Page 27: ...25 25 INTERMEDIATE SHAFT ASSEMBLY...
Page 28: ...26 26 TOP SHAFT ASSEMBLY...
Page 29: ...27 27 BEARING BLOCK ASSEMBLY...
Page 30: ...28 28 FENCE ASSEMBLY...
Page 35: ...33 33 NOTES...
Page 36: ...34 34...