
11
11
ASSEMBLY AND SET UP
The table is shipped mostly assembled.
1. Install the handle rail into the tube pockets
(A) at the end of the table and tighten the
M8 x 30 locking bolts enough to securely
hold the handle in position.
2. Insert the foot pedal into the pump lever
(B) and secure in place with the bolt.
OPERATION
1. Place the material on the table.
a. Always place the materials on the table so that they are stable and well balance.
b. Material should not extend into or interfere with the handle and operating controls.
c. Lower the table as low as is practical when moving the table with materials on it.
d. Always engage the caster brakes when not moving the table to prevent unintended
movement.
2. To Raise the table:
a. Place both hands on the handle to prevent table movement and to assist in
maintaining balance and use either foot to pump the foot pedal to raise the table to
the desired height.
3. To Lower the table:
a. Carefully squeeze the control lever in the upper right corner of the handle and lower
the table to the desired height.
CAUTION:
Keep hands and fingers clear of the scissors arms. Stand
behind the handle and watch for possible pinch points whenever raising or lowering
the table.
A
B
Summary of Contents for B-CART
Page 15: ...13 13 B CART PARTS DIAGRAM...
Page 18: ...16 16 B CARTX2 PARTS DIAGRAM...