background image

 

 

 

 

 

 

 

 

 

 

 

 

Nova846   

Outdoor 8x5W eNodeB 

Quick Guide 

 

 

 

 

 

 

 

 

 

 

P/N: 1701000180 

Document  version:  01 

 

All rights reserved © Baicells Technologies Co., Ltd. 

Summary of Contents for Nova846

Page 1: ...Nova846 Outdoor 8x5W eNodeB Quick Guide P N 1701000180 Document version 01 All rights reserved Baicells Technologies Co Ltd...

Page 2: ...quipment In DC mode each carrier is treated as an independent cell supporting 128 128 users and each supporting 20 MHz bandwidth Using a Nova846 in DC mode simplifies and streamlines the deployment of...

Page 3: ...nce Highly secured with equipment certification against potential intrusion risk TR 069 network management interface support Security services to provide timely protection against potential security r...

Page 4: ...ternal transmission network used for data backhaul ETH1 Ethernet interface 2 SFP optical interface connect to external transmission network used for data backhaul PWR Power interface 48V 40 5V to 57V...

Page 5: ...y On S1 link is up OFF SFP module is out of place Ethernet cable is out of place power of the optical module is powered off or S1 link is down Technical Specification 1 4 1 4 1 Hardware Specification...

Page 6: ...PSK R 1 3 25RB standard 1 4 2 Global Part Numbers Model No Description sBS71010 Band48 10MHz 20MHz per carrier DL 4 x 4 or 2 x 2 on each carrier 2 carriers 1 4 3 Software Specification Item Descriptio...

Page 7: ...are upgrading and loading Support log Support connectivity diagnosis Support self start and self configuration NOTE Future software version will release 1 4 4 Environment Specification Item Descriptio...

Page 8: ...or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different fro...

Page 9: ...ing GPS antenna installation requirements before installing it on the eNB No major blocking from buildings in the vicinity Make sure the space atop is at least 45 degrees unblocked by any buildings Av...

Page 10: ...e connector 3 Push the cold shrink tube to the top joint and pull out the strip 4 Ensure the cold shrink tube is tightly fitted with the connection Install on Pole 2 5 Check to ensure the diameter of...

Page 11: ...0 Following steps introduce how to fix the pre assembled eNB on a pole Install on Wall 2 6 Take apart assembly bracket first only remains the wall bracket as shown in Figure 2 3 Figure 2 3 Wall Bracke...

Page 12: ...11 Following steps introduce how to fix the pre assembled eNB on a wall Connect Cable 2 7...

Page 13: ...ower cable connects to the DC power supply directly If AC power is selected the power cable must connect to the AC power supply through a DC AC adaptor 2 The antenna ports and CAL GPS port must have w...

Reviews: