pBS2120 Base Station Installation Guide   

 

2. Out-of-Box Audit 

Before opening the box, make sure the package is in good condition, undamaged and 

not wet. During the unpacking, avoid potential damaging impacts from hits or excessive 

force. Once unpacked, check the contents to see if they are consistent with that in the 

shipping list shown in Table 2-1. 

Table 2-1 Shipping List 

No. 

Item 

Quantity 

Description 

pBS2120 base station 

Check whether the base station

’s tag 

is consistent with the requirement 

Base station mounting 

bracket 

Fixed with base station 

Integrated bracket for on 

pole or on wall   

Used for fix on pole or on wall 

U shape clamp 

Used for fix on pole 

Omega 

 

Used for fix on pole 

Screw package 

M6*12 combined screw * 8 

M8 hex nut * 2 

PoE power adaptor 

Power cable 

The length is 1m. 

Ground terminal 

Used for making ground cable. 

10 

Warranty 

11 

Certification 

12 

User guide 

 

Note: 

During  the  unpacking,  if  the  outer  package  is  damaged  or  wet,  stop  unpacking  and  find  the  cause. 

Report the issue to the vendor. For any shortage or damage that is identified, report the local vendor 

within 10 days. 

 

Summary of Contents for pBS2120

Page 1: ...01 All rights reserved Baicells Technologies Co Ltd pBS2120 Base Station Installation Guide...

Page 2: ...No part of this specification may be reproduced in any form or means without the prior written consent of Baicells Disclaimer This specification is preliminary and is subject to change at any time wi...

Page 3: ...t of Box Audit 5 3 Installation Preparation 6 Support Materials 6 3 1 Installation Tools 6 3 2 Installation Environment 7 3 3 3 3 1 Locational Requirements 7 3 3 2 Environmental Requirements 7 Personn...

Page 4: ...and operators enterprises and so on Features 1 2 Adopt the integration design of baseband and RF flexible to deploy Based on 3GPP international standard TD LTE technology provide high speed data servi...

Page 5: ...2120 Appearance The pBS2120 interfaces and indicators are shown in Figure 1 2 Figure 1 2 pBS2120 Interfaces and Indicators The pBS2120 interfaces are described in Table 1 1 Table 1 1 pBS2120 Interface...

Page 6: ...dware alarm e g VSWR alarm OFF No alarm Technical Specification 1 4 1 4 1 Hardware Specification Item Description LTE Mode LTE TDD LTE Frequency 3650 MHz 3700 MHz Channel Bandwidth 10 MHz 20 MHz Outpu...

Page 7: ...ing Support Network Management Interface Support TR069 interface protocol Northbound Interface Support Web service Socket FTP and other interface modes MTBF 50000 hours MTTR 1 hour Maintenance Support...

Page 8: ...is consistent with the requirement 2 Base station mounting bracket 1 Fixed with base station 3 Integrated bracket for on pole or on wall 1 Used for fix on pole or on wall 4 U shape clamp 1 Used for fi...

Page 9: ...for Installing Base Station Item Description Ethernet cable Outdoor CAT6 Shorter than 100m 330 feet Ground cable 16mm yellow green wire Installation Tools 3 2 The following tools are needed during the...

Page 10: ...ion can be chosen to meet the communication engineering environmental requirements as well as the technical requirements of network planning and communication equipment 3 3 2 Environmental Requirement...

Page 11: ...operate the equipment This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasona...

Page 12: ...aux deux conditions suivantes 1 l appareil ne doit pas produire de brouillage et 2 l utilisateur de l appareil doit accepter tout brouillage radio lectrique subi m me si le brouillage est susceptible...

Page 13: ...r of the pole 40mm 100mm 1 As the following figure assemble the bracket for pole installation and fasten screws 2 Mounting bracket installs is complete as shown in the following figure 3 Fit the base...

Page 14: ...12mm diameter and 80mm depth holes in the wall by following the marked locations 3 Check the up down direction of the installation rack and then fix the base station to the wall using M8 80 expansion...

Page 15: ...ects to the PoE power adaptor 4 3 2 Connect Ground Cable Make the grounding cable according the actual situation of the installation site The grounding screws of pBS2120 located on the bottom of the b...

Page 16: ...Table 5 1 Table 5 1 pBS2120 Indicator Description Identity Color Status Description PWR Green Steady On Power On OFF No Power Supply ACT Green Steady On The cell is activated OFF The cell is not acti...

Reviews: