Nova-246 Outdoor LTE Base Station Installation Guide
14
devices. Avoid interference from other transmitting antennas to the GPS antennas.
Should be installed within 45 degrees to the lightning rod.
The GPS has been assembled before packing, the only installation step is to fix the GPS
mounting bracket on the base station using the M4 x 14 screws.
Install on Pole
3.4
Required diameter of the pole: 40mm to 100mm.
Suggest the installation height higher than 120cm.
The mount bracket has been assembled before packing.
1. Unscrew the four screws of the assembled bracket and slide the two omegas to the
left as the following figure, and then turn the two omegas up or down.
2. Make sure the base station
’s installation height, fit the thread rod of the assembled
bracket to the pole, and then turn the two omegas to proper position as the following
figure, and slide the two omegas to the right, and then fasten the four screws.