Die single parts of the micro::station / nano::station are pre-assembled on the panel. The complete panel will be
mounted onto a flat surface (wall, control cabinet, etc.) vertically. 4 holes with a hole diameter of 9 mm are provi
-
ded for this purpose.
Before mounting a
micro::station for clean
water, the supplied sto-
rage board must be scre
-
wed onto the panel (see
fibures on the right). The
screws required for this
are included in the scope
of delivery.
The correct dimensions
and the space required for
mounting can be found in
the figures in section 3.3.
4.3
Mounting of Sensors and Cleaning Devices
To protect the sensitive measuring sensors during transport, they are specially packed and not yet pre-assembled.
All probes and sensors are to be installed in the flow cells provided, which are already mounted on the panel. This
is done according to the mounting instructions (chapter 4) of the respective manuals of the sensors.
When using automatic cleaning devices (e.g. autobrush), these are already electrically connected to the operator
terminal and installed in the flow cell for transport. According to the mounting instructions, the autobrush must be
removed before installing the probes (spectrometer probe or i::scan).
!
Immediately after completion of the installation, the flow of the monitoring station should be established and
the initial start up should take place. If these activities are planned for a later time, the existing protective
caps should be left on the sensors to avoid damage to the sensitive measuring elements of the sensors.
micro::station / nano::station, 03-2023 Release
Copyright © s::can GmbH
www.s-can.at
16 / 36
Summary of Contents for scan micro station
Page 1: ...Manual micro station nano station March 2023 Release S 36 M...
Page 2: ......
Page 35: ......