Frame Assembly
Phase 3
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (2) G3 - PERGOLA BEAM - W101679
• (2) H5 - RAIL SUPPORT - W101710
• (2) G1 - GROUND BOARD - W101673
Step 1: Attach 'G3' Pergola Beam to
'B1' Post using Barrel Nuts 'E',
Washers 'AC' & 'AD' and Bolt 'M', as
shown.
G3
B1
B1
H5
G1
G1
H5
G3
B1
B1
S
AC
AC
B1
BG
G1
S
AC
BG
AB
AD
G3
M
AC
AC
B1
AD
AD
E
Hardware needed:
• (8) E - NUT BARREL WH 5/16x1-3/4 - H100007
• (12) AD - WASHER LOCK EXT 12x19 - H100031
• (20) AC - WASHER LOCK EXT 8x19 - H100030
• (8) M - BOLT WH 5/16x2-1/2 - H100014
• (12) S - BOLT WH 5/16x3-3/4 - H100019
• (12) BG - T-NUT 5/16 - H100074
• (4) AB - LAG SCREW WH 5/16x3 - H100029
H2
H1
Step 2: Attach 'G3' Pergola Beam to
'H1' & 'H2' Beam Supports using Lag
Screw 'AB' and Washers 'AD', as
shown.
Step 3: Attach 'H5' Rail Support to 'B1'
Post using T-Nuts 'BG', Washers 'AC'
and Bolt 'S', as shown.
Step 4: Attach 'G1' Ground Board to
'B1' Post using T-Nuts 'BG', Washers
'AC' and Bolt 'S', as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.