Figure 13. Checking and Setting the Zero Setting
6.4. IAM Controller
If your installation has an IAM Controller, ensure that the controller’s
functions are activating accordingly when testing the sensors.
Step
Checking the IAM Controller
1
Red LED should illuminate for sensors that are in alarm.
2
Horn should sound if connected and if one or more alarms
are present.
3
Relays should function properly if enabled and one or more
alarms are present.
4
If enabled, remote reset will reset any downstream IAM
monitor or IAM-C connected to a channel, once gas has
cleared